GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
4-4
Section 4-3 - General Procedure
4.) The shutdown process takes 15 seconds and the power off sequence is complete when the power
status LED is turned Amber.
5.) Disconnect the probes.Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
4-3-2-2
Scanner Shutdown
Disconnect the Mains Power Cable is necessary.
For example:
Relocating the scanner.
4-3-2-3
Full Maintenance Reboot (LOGIQ P3)
Full Maintenance Reboot will fully restart the whole system for performance improvement.
1.) Press the
Power On/Off
switch at the front of the system once.
2.) Click “Shutdown”.
3.) Full Maintenance Reboot dialog is displayed.
4.) During Full Maintenance the pop up window will two options “Ok” and “Cancel” press cancel for
Normal shutdown (Hibernate) and Ok for Shutdown.
CAUTION
DO NOT unplug and/or transport the unit until after the power off sequence has been completed.
Failure to do so may result in corrupted patient files.
Figure 4-3 “Full Maintenance Reboot” dialog
Содержание LOGIQ P3
Страница 2: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 1 2 ...
Страница 9: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL vii ...
Страница 98: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 3 32 Section 3 10 Paperwork ...
Страница 194: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 7 26 Section 7 6 Troubleshooting ...
Страница 294: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 8 100 Section 8 14 Loading Software ...