![GE Ettan IPGphor 3 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/ge/ettan-ipgphor-3/ettan-ipgphor-3_operating-instructions-manual_128030023.webp)
will result in...
Power failure to...
•
The Ettan IPGphor computer shuts down.
•
Any running experiments will be continued and com-
pleted.
•
Scanned images will be saved and uploaded to the
computer when computer contact has been re-estab-
lished.
Computer
A UPS can eliminate data loss during and after a power failure, and allow time
for a controlled shut-down of Ettan IPGphor 3.
Note:
Restart after emergency
shutdown/power failure
When the power returns to normal no experiments that were running at the time of
emergency shutdown will be continued. Proceed as follows:
Action
Step
Start the instrument, see Turn on power and run diagnostic program, on
page 66.
1
Restart the software.
2
When the system is connected, the log event will be stored in the system
log.
If you wish to continue a run, set up and run a new experiment with the
appropriate/remaining steps to complete the run in the best way.
3
Ettan IPGphor 3 Operating Instructions 28-9635-51 AC
23
2 Safety instructions
2.3 Emergency procedures