[EN] English - K0460
Electrical operations 3-9
Issue 1
1.
Set the applicable software options; see
Section 3.2.1
(Procedure overview)
. This example shows one function:
•
Thermocouple (TC) is set to source a temperature. The
Utility
is set to
Switch Test
. The
Automation
is set to
Ramp;
see
Section 2.9.2
.
2.
Complete the electrical connections. Because it is a
Channel 1 function (TC), Channel 2 (CH2) must have the
switch connections.
3.
For the
Ramp
process, set “High” and “Low” values that are
applicable to the switch value. Then, to get an accurate
switch value, set a long “Travel” period.
Use Start/Stop to start and stop the “Ramp” cycle. If
necessary, supply the output values in the opposite direction
until the switch changes condition again.
4.
The display shows:
•
the values to open and close the switch
•
the hysteresis value
5.
To do the test again, use the reset button.
1
3
2
4
Start/Stop
Closed
Open
Reset
Содержание Druck DPI 620-IS
Страница 4: ...Page 4 of 98 K0460 Issue 1 ...
Страница 5: ...GE Measurement Control Systems Druck DPI 620 IS advanced modular calibrator user manual K0460 ...
Страница 12: ...Issue 1 viii About this manual K0460 EN English ...
Страница 21: ... EN English K0460 Instrument parts accessories and options 1 5 Issue 1 ...
Страница 22: ...Issue 1 1 6 Instrument parts accessories and options K0460 EN English ...
Страница 42: ...Issue 1 2 20 Prepare the instrument K0460 EN English ...
Страница 60: ...Issue 1 5 2 Instrument communications K0460 EN English ...
Страница 64: ...Issue 1 6 4 Datalog operation K0460 EN English ...
Страница 78: ...Issue 1 9 2 Maintenance procedures K0449 EN English ...
Страница 94: ...Issue 1 10 16 Calibration procedures K0460 EN English ...
Страница 96: ...Issue 1 11 2 General specification K0460 EN English ...
Страница 97: ...Customer service Visit our web site www gesensinginspection com ...
Страница 98: ......