Issue 1
4-4 Pressure indicator operation (MC 620-IS)
K0460 - [EN] English
•
When all the software selections are complete, make the
applicable pressure and electrical connections. Examples:
Measure pressure (
Section 4.4.4
).
4.4.2
Set-up a Leak Test
1) Set the Utility
Set the
Utility
to
Leak Test
(
Section 2.8.6
).
2) Set the Leak Test
options
When setting the
Utility
to
Leak Test
, set these options:
Wait Time:
The time before the test starts in
hours:minutes:seconds (hh:mm:ss).
Test Time:
The period of the leak test in
hours:minutes:seconds (hh:mm:ss).
Note:
To set the Leak Test options, have a pressure module
correctly installed (
Section 4.2.1
).
1
3
4
Select Leak Test
Select Test Time
Steps 5 and 6: Set the Test Time
+ Set the Wait Time.
TAP the window
(Maximise)
Select Settings
5
6
7
Start the test and let it
complete.
Go back to the Home window. Start the test
when the pressure system is set-up.
Stop the test (with no results)
2
Содержание Druck DPI 620-IS
Страница 4: ...Page 4 of 98 K0460 Issue 1 ...
Страница 5: ...GE Measurement Control Systems Druck DPI 620 IS advanced modular calibrator user manual K0460 ...
Страница 12: ...Issue 1 viii About this manual K0460 EN English ...
Страница 21: ... EN English K0460 Instrument parts accessories and options 1 5 Issue 1 ...
Страница 22: ...Issue 1 1 6 Instrument parts accessories and options K0460 EN English ...
Страница 42: ...Issue 1 2 20 Prepare the instrument K0460 EN English ...
Страница 60: ...Issue 1 5 2 Instrument communications K0460 EN English ...
Страница 64: ...Issue 1 6 4 Datalog operation K0460 EN English ...
Страница 78: ...Issue 1 9 2 Maintenance procedures K0449 EN English ...
Страница 94: ...Issue 1 10 16 Calibration procedures K0460 EN English ...
Страница 96: ...Issue 1 11 2 General specification K0460 EN English ...
Страница 97: ...Customer service Visit our web site www gesensinginspection com ...
Страница 98: ......