![GE Advent Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/ge/advent/advent_installation-instructions-manual_132114010.webp)
8
Advent Commercial Fire System
Mounting the Panel
Use the following procedure to mount the panel to the wall
or wall studs using the supplied mounting hardware and the
panel mounting holes shown in Figure 3.
&$87,21
Make sure you are free of static electricity whenever you
work on the panel with the cover open. To discharge any
static, first touch the metal panel chassis, then stay in
contact with the chassis when touching the circuit board.
Using an approved grounding strap is recommended.
1.
Open the panel door and remove the panel circuit
board, accessory kit, and packing material.
2.
Carefully remove the circuit board from the packing
and put it in a safe static free location.
3.
Remove the desired panel wiring knockouts.
4.
Mount the optional key lock (if used) into the panel
door.
5.
Place the enclosure in position against the wall. Make
sure enclosure is level and mark the locations of the
two mounting holes and two keyhole mounting holes.
Remember to leave room near the enclosure for any
optional modules.
6.
Use the appropriate mounting anchors and screws for
your application. Partially insert screws into the two
anchors at the two top keyhole locations, and then hang
the panel chassis on the two screws.
7.
Recheck level, insert the two lower screws, and then
tighten all four mounting screws.
8.
Route all wires to the panel.
9.
Install the panel circuit board, using the five supplied
board mounting screws.
Figure 3. Mounting the Panel and Circuit Board
Installing Optional Panel Snapcards
8Z Input SnapCard (60-757)
*
4 Output SnapCard (60-758)
4Z Input/2 Output Combo SnapCard (60-756)
+
24V Smoke Loop SnapCard (60-767)
The SnapCard Connectors shown in Figure 4 allow for the
installation of two expansion SnapCards.
Carefully install a SnapCard onto the desired SnapCard
Connector and secure it in place with the two screws
included with the card.
Note
If installing 24V Smoke Loop SnapCard in the primary
expansion card connector slot, you will not be able to use
the panel cabinet knockouts behind and to the right of the
card. Whenever possible install this card into the second-
ary expansion card connector slot.
SuperBus 2000
Commercial RF
Transceiver
22 ga.—1250 ft.
18 ga.—3000 ft.
Solid or
Stranded
SuperBus 2000 8Z Input
Module
22 ga.—1750 ft.
18 ga.—4000 ft.
Solid or
Stranded
SuperBus 2000 4-Relay
Output Module
22 ga.—200 ft.
18 ga.—500 ft.
Solid or
Stranded
SuperBus 2000 Dual
Phone Line Module
22 ga.—350 ft.
18 ga.—900 ft.
Solid or
Stranded
SuperBus 2000 Printer
Module
22 ga.—1500 ft.
18 ga.—4000 ft.
Solid or
Stranded
SuperBus 2000 RS 232
Automation Module
*
22 ga.—1500 ft.
18 ga.—4000 ft.
Solid or
Stranded
SuperBus 2000 LED
Driver Board
*
22 ga.—75 ft.
18 ga.—200 ft.
Solid or
Stranded
4 Input/2 Output
SnapCard
N/A
N/A
8Z Hardwire Zone
Expander SnapCard
N/A
N/A
4 Output SnapCard
N/A
N/A
Table 11. Wire Recommendations (Continued)
Device
Max. Wire Length to
Panel
Wire
Type
*) Not investigated by UL.
*) For Residential Use Only.
8 5 4 3 G 0 7 B . D S F
C O N T R O L
P A N E L
E N C L O S U R E
( D O O R O P E N )
B A C K U P
B A T T E R Y ( s )
K E Y H O L E
M O U N T I N G
H O L E S
M O U N T I N G
H O L E S
W I R I N G
K N O C K O U T S
E A R T H G R O U N D
C H A S S I S S C R E W
( G R E E N )
-
+
C O N T R O L P A N E L
C I R C U I T B O A R D
-
+
S T U D S 1 6 " O N C E N T E R
M O U N T T O S T U D S O R
I N S T A L L 3 / 4 " P L Y W O O D
M O U N T E D T O S T U D S ,
T H E N H A N G P A N E L O N
P L Y W O O D