Step 4 – Empty De-scale Solution
a) Empty water tank, rinse and fill water
tank with clean water. Replace tank into
machine.
b) Ensure drip tray is empty and installed
into position. Place cloth on right side of
the drip tray to stop steam escaping.
c) Rotate left screw first, counter-clockwise
until fully open. Water will begin to flow
into drip tray.
d) Repeat with right screw. Steam will be
released from the boiler.
CAUTION HOT STEAM!
e) Close valves when water stops flowing
through both outlets. Empty drip tray and
re-assemble onto unit.
CAUTION HOT WATER!
Step 5 – Fill Boilers
Press 1 cup button and the 20 minute timer
will begin. Countdown timer is finished when
LCD leaves BLANK.
(This allows any remaining solution to be
removed from system).
Step 6 – Flush Boilers
a) Empty water tank, rinse and assemble
new water filter into tank.
b) Fill water tank with clean water and
replace into machine.
c) Rotate screws counter-clockwise, as per
previous instructions until fully open.
Water will begin to flow into drip tray.
d) Close valves when water stops flowing
through both outlets. Empty drip tray and
re-assemble onto unit.
CAUTION HOT WATER!
e) Press 1 cup button to complete the de-
scale procedure. Machine will heat up as
normal.
76
77