CFN Series System
2-16
03/07/03
24. WORKSHEET FOR PUMP/CRIND (IF USED)
Pump
#
Pump Type
(H111, MPD-3, etc.)
Two
Wire
Addr
PCU
#
PCU
Slot
# of
Hose
s
CRIN
D
Addr
Read
er
#
Price levels used at site 0 1 2 3 4 5 (Circle levels)
Price at level 0 is same as price at level 2: Yes No (Circle one)
Price at level 0 is same as price at level 1: Yes No (Circle one)
Price level for price bars: 1 2 Both None (Circle one)
Содержание CFN Series
Страница 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Страница 2: ......
Страница 8: ...CFN Series System Contents 4 03 07 03 ...
Страница 24: ...CFN Series System 2 12 03 07 03 ...
Страница 25: ...Site Information 03 07 03 2 13 ...
Страница 26: ...CFN Series System 2 14 03 07 03 ...
Страница 38: ...CFN Series System 4 6 03 07 03 ...
Страница 56: ......
Страница 58: ......
Страница 72: ......
Страница 82: ...CFN Series System 9 10 03 07 03 ...
Страница 104: ...CFN Series System 12 12 03 07 03 ...
Страница 108: ...CFN Series System 13 4 03 07 03 ...