![background image](http://html1.mh-extra.com/html/gasboy/cfn-series/cfn-series_startup-manual_568198047.webp)
Jumpers & Switch Settings
03/07/03
5-9
3.
Pulse Connection: Verify that the
K1
through
K4
jumpers (pulse type jumpers) match the
type pulser being used for each pump position. Use the table below to determine your
settings.
WARNING
K1
to
K4
jumpers
must
be set in the configurations shown before turning on power to the
PCU or damage to the system components may occur.
4.
Debounce Configuration: Verify that the
K5
jumper (debounce) is set properly.
The K5 jumper should remain jumpered
for all Reed switch quantity pulsers and
unjumpered for all electronic and money
pulsers.
5.
Replace the cover plate on the pump control I/O board and re-install the board into the card
cage.
6.
Replace the five green connectors into the proper sockets on the front of the Pump Control
I/O board.
7.
Repeat all steps for both the EXPMUX Pump Control CPU and Pump Control I/O PCBs for
each pump control unit.
Содержание CFN Series
Страница 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Страница 2: ......
Страница 8: ...CFN Series System Contents 4 03 07 03 ...
Страница 24: ...CFN Series System 2 12 03 07 03 ...
Страница 25: ...Site Information 03 07 03 2 13 ...
Страница 26: ...CFN Series System 2 14 03 07 03 ...
Страница 38: ...CFN Series System 4 6 03 07 03 ...
Страница 56: ......
Страница 58: ......
Страница 72: ......
Страница 82: ...CFN Series System 9 10 03 07 03 ...
Страница 104: ...CFN Series System 12 12 03 07 03 ...
Страница 108: ...CFN Series System 13 4 03 07 03 ...