![background image](http://html1.mh-extra.com/html/gasboy/cfn-series/cfn-series_startup-manual_568198073.webp)
03/07/03
9-1
Section 9
DC POWER MEASUREMENT AND ADJUSTMENT
The following steps describe, for each of the components, how to measure the voltages required
in Section
9. DC POWER
of the Start-up form. If any of the measured DC voltages are outside of
the tolerances noted (except for +5 which can be adjusted), immediately shut off the
AC POWER
switch of the unit and diagnose the problem. Test points are shown for each of the system
devices in this section. All voltage measurements should be taken with the negative lead of the
digital voltmeter on the ground (
GND
) test point.
✍
9. DC POWER
As you are measuring the noted voltages, fill in the readings for each in this section of the Start-up
Form.
Содержание CFN Series
Страница 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Страница 2: ......
Страница 8: ...CFN Series System Contents 4 03 07 03 ...
Страница 24: ...CFN Series System 2 12 03 07 03 ...
Страница 25: ...Site Information 03 07 03 2 13 ...
Страница 26: ...CFN Series System 2 14 03 07 03 ...
Страница 38: ...CFN Series System 4 6 03 07 03 ...
Страница 56: ......
Страница 58: ......
Страница 72: ......
Страница 82: ...CFN Series System 9 10 03 07 03 ...
Страница 104: ...CFN Series System 12 12 03 07 03 ...
Страница 108: ...CFN Series System 13 4 03 07 03 ...