![background image](http://html1.mh-extra.com/html/gasboy/cfn-series/cfn-series_startup-manual_568198055.webp)
Jumpers & Switch Settings
03/07/03
5-17
A C07263 cable is also needed on the Site Communication I/O board from P10 connector to
pins 6 through 10 of P3 (for port1) or P4 (for port 3). This cable is installed in the head of the
Islander at the factory.
Cabling and Port Jumper Configuration for Wayne Pumps
The SC II CPU K1 (port1) or K2 (port 3) jumper patch must be configured as
follows to communicate with the Wayne pumps.
The jumpers on the Site Communication I/O board in the head of the Islander (on the inside of the
left partition) for port 1 or port 3 must be configured as shown below:
Содержание CFN Series
Страница 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Страница 2: ......
Страница 8: ...CFN Series System Contents 4 03 07 03 ...
Страница 24: ...CFN Series System 2 12 03 07 03 ...
Страница 25: ...Site Information 03 07 03 2 13 ...
Страница 26: ...CFN Series System 2 14 03 07 03 ...
Страница 38: ...CFN Series System 4 6 03 07 03 ...
Страница 56: ......
Страница 58: ......
Страница 72: ......
Страница 82: ...CFN Series System 9 10 03 07 03 ...
Страница 104: ...CFN Series System 12 12 03 07 03 ...
Страница 108: ...CFN Series System 13 4 03 07 03 ...