![background image](http://html1.mh-extra.com/html/gasboy/cfn-series/cfn-series_startup-manual_568198043.webp)
Jumpers & Switch Settings
03/07/03
5-5
Pump Control EXPMUX CPU Board
1.
Unlock and open the front door of the pump control unit.
2.
Make sure all override switches are in the
AUTO
position. See Figure 5-1.
3.
Make sure the AC power and battery switches, located in the upper righthand corner of the
power supply are turned
OFF
(down).
4.
Loosen the screw for the card cage section, and swing out the card cage.
5.
Remove the pump control EXPMUX CPU board, located in the rear portion of the card cage,
by pulling on the top white tab.
Figure 5-2. EXPMUX CPU Board
6.
Locate the
K1
jumper patch and install the jumper. This jumper allows battery voltage to the
RAM. It should be installed for normal operation and removed for storage to prevent battery
discharge.
Содержание CFN Series
Страница 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Страница 2: ......
Страница 8: ...CFN Series System Contents 4 03 07 03 ...
Страница 24: ...CFN Series System 2 12 03 07 03 ...
Страница 25: ...Site Information 03 07 03 2 13 ...
Страница 26: ...CFN Series System 2 14 03 07 03 ...
Страница 38: ...CFN Series System 4 6 03 07 03 ...
Страница 56: ......
Страница 58: ......
Страница 72: ......
Страница 82: ...CFN Series System 9 10 03 07 03 ...
Страница 104: ...CFN Series System 12 12 03 07 03 ...
Страница 108: ...CFN Series System 13 4 03 07 03 ...