COMMISSIONING (continued)
Powering the panel
It is recommended that following the connection of the loop circuit the panel is powered up and
tested before proceeding with the connection of the sounders, remote outputs and auxiliaries.
When the panel is first powered up, the panel must be initialised, or a configuration program
downloaded. The loop is scanned and the devices are identified. Each device is displayed showing
its address and type, and the zone as 'unassigned', allowing the operator to allocate each device to
the required zone (see Initialisation).
Mains connection
Ensure that the incoming mains supply is fully isolated. Remove the fuse from the mains terminal
block and connect the incoming live, neutral and earth wires to the L, N and Primary Earthing Stud.
Switch on the supply (do not replace the fuse at this stage).
Содержание FBUL NP12-12
Страница 2: ......
Страница 27: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 27 LOOP PCB PCFSB11 Loop Card...
Страница 35: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 35...
Страница 45: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 45...
Страница 87: ......
Страница 88: ......