MAINTENANCE.
Periodic system maintenance should be carried out in line with the local design, maintenance and
installation regulations.
The standby batteries should be checked for physical condition to include checking integrity of
the connections and battery cables, The batteries should be load tested to ensure they have ade-
quate capacity. Any sign of venting or case warping should be dealt with by replacement and
careful checking of charging voltages etc.
The panel should require no other regular maintenance other than cleaning with a soft cloth and a
light application of a non abrasive cleaning agent (soapy water) to clean the fascia. Do not use
strong solvents to clean the panel.
The event logs should be inspected and any recurring faults should be investigated.
Содержание FBUL NP12-12
Страница 2: ......
Страница 27: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 27 LOOP PCB PCFSB11 Loop Card...
Страница 35: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 35...
Страница 45: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 45...
Страница 87: ......
Страница 88: ......