Fusion Installation & Commissioning Manual Approved document No UI-FBU-01 issue 3.0
68
MENU AND CONTROL FUNCTIONS (Continued)
Engineering options (Cont)
7)
Set number of boards. This must be set to correct quantity of radial / loop boards in
the panel. Also If an extension LED board is in use this must be set. A fault is
enunciated if this is not correct.
8)
View loop Firmware versions. Select to view software version No. for each loop.
9) Initialise board parameters. Use this option to select a board to reset the memory.
Caution
this will erase all previous settings. This option will reset the zone allocations of
radial cards.
10) Set sounder resound options. Resound options control if a new alarm is sounded
when another fire is detected in the same zone. ‘Resound’ causes sounders to be
activated by a new alarm, ‘Silent’ causes new alarms not to re activate sounders in the
same zone if a new alarm is detected, Can be set for ‘all’ zones or individually.
11) Set daylight saving options. Daylight saving is automatically set to start on the last
Sunday of March and end on the last Sunday of October. DST can be turned off or
alternate dates selected, depending on local requirements.
5.
Monitor device response
. Once the device is selected then the direction of polling can be
altered by the 4 / 6 toggle. Then the 3 bit outputs can be checked.
6.
This is a device maintenance check
, where the maintenance threshold can be set, perhaps
for servicing purposes, then anything outside of this limit is displayed on the LCD.
7.
View data corruption count
. This facility gives some indication of the integrity of the loop
wiring. Initially select the loop to be scanned. E.g. select loop number 1.
A display is given thus:
It is necessary to wait for a short time period (about 10 seconds) for the measurement to be updated.
The number is the quantity of data errors and corrupted returns given from the loop. The total
number since count started is displayed.
A high number may indicate that the wiring should be checked for earth faults or potential
interference from high voltage sources.
It is natural for any system to have a few data errors. The panel will report bad responses as a fault if
there is excessive noise.
8.
Set investigation delay options
.
1. Set delay times
Ack 000 :S
Acknowledge delay, max 180 secs
Invest 000 :S
Investigation delay, max 420 secs
2. Delay zone
Select individual or all zones for delay.
3. Delay remote
Set ‘Yes’ to delay remote output
4. Delay sounders
Set ‘Yes’ to delay all sounders
VIEW LOOP 1 CORRUPTION COUNT
000 CORRUPTED RESPONSES PER SCAN TOTAL 0000
Содержание FBUL NP12-12
Страница 2: ......
Страница 27: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 27 LOOP PCB PCFSB11 Loop Card...
Страница 35: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 35...
Страница 45: ...Fusion Installation Commissioning Manual Approved document No UI FBU 01 issue 3 0 45...
Страница 87: ......
Страница 88: ......