S2E-17-0209_IM_WR2120_C
32
4
.
Pull outdoor cable into protective tube
(10 pcs)
Cables pull between SPU and DPU
Protective Tube 1 (P1): AC power cable (3pin)
LAN cable x2
Cables pull between SPU and ATU (radome)
Protective Tube 2 (P2): AC power cable (3pin)
Control cable (both end
HDR-26pin
connector)
Control cable (both end HDR-14pin connector)
LAN cable x1
Protective Tube 3 (P3): Signal cable (SMA 3 pcs)
5
.
Make the power plug
- Plug in 3 pin earthed power plug that
running through the SPU into near DPU.
-
6. Activation test
- Turn ON the circuit breaker.
- Follow the instruction to test it.
7. Air conditioner temperature setting
Setup the cooling temperature to
25
º
C.
(1) Press [Set] button to indicate a
temperature of setting.
(2) Press [Up], [Down] button Setup a
temperature to 25 Celsius degree.
(3) Press [Set] button to indicate a
current temperature.
P3 P2
P1
Control panel
25
Display (Temperature will indicate when power up)
Setup button
Down button
Up button
Alarm lamp (GREEN)
Lamp ON: Cooling ON
Lamp OFF: Cooling OFF
0.5S Lamp Blink: Forced cooling ON
1.0S Lamp Blink: Heating ON
Alarm lamp (RED)
Lamp ON: Alarm occurs
Lamp Blink: Forced heating ON
Содержание 9ZWWR2120
Страница 1: ...S2E 17 0209_IM_WR2120_C i INSTALLATION MANUAL MODEL WEATHER RADAR TYPE WR2120 www furuno com...
Страница 44: ...S2E 17 0209_IM_WR2120_C 2 8 OUTLINE DRAWING 1 Antenna Unit...
Страница 45: ...S2E 17 0209_IM_WR2120_C 3 2 Signal Processing Unit Storage box...
Страница 46: ...S2E 17 0209_IM_WR2120_C 4 4 Data Processing Unit...
Страница 47: ...S2E 17 0209_IM_WR2120_C 5 5 Data Processing Unit DPU Power Supply...
Страница 49: ...S2E 17 0209_IM_WR2120_C 7 WR2120 Configuration...