S2E-17-0209_IM_WR2120_C
31
5.2. Signal Processing Unit (Store into storage box)
1. Fix the storage box on the ground or fixed
steel using M10 bolt x4pcs.
2. Connect the cable from Display Unit
Caution:
Make sure an electric current is
not flow
(1) Connect the AC power cables (3pin) to
the terminal base (TB1)
(2) Connect LAN cable (U3 LAN 1) to the 1
LAN socket of PXI and the other side of
LAN cable connect to DPU
.
3. Connect the cable of the Antenna Unit
(1) Connect the AC power cables (3pin) to
the terminal base (TB2)
(2) Connect and fix the control cable (HDR
14pin connector) to each S-COM
connector, and control cable (HDR-26pin
connector) to RF-CONT SIG connector.
(3) Fix with the torque wrench (74Z-0-0-21)
after connecting 3 signal cables (TX IF,
RX IF V, RX IF H) to SPU – UNIT
connector.
Top view of storage box
M10 bolt
M10 bolt
In a case of using
M10 bolt and nut
to fix on steel
stand.
2. (2) LAN cables
3. (2) Control cables
3. (3) Signal cables
Содержание 9ZWWR2120
Страница 1: ...S2E 17 0209_IM_WR2120_C i INSTALLATION MANUAL MODEL WEATHER RADAR TYPE WR2120 www furuno com...
Страница 44: ...S2E 17 0209_IM_WR2120_C 2 8 OUTLINE DRAWING 1 Antenna Unit...
Страница 45: ...S2E 17 0209_IM_WR2120_C 3 2 Signal Processing Unit Storage box...
Страница 46: ...S2E 17 0209_IM_WR2120_C 4 4 Data Processing Unit...
Страница 47: ...S2E 17 0209_IM_WR2120_C 5 5 Data Processing Unit DPU Power Supply...
Страница 49: ...S2E 17 0209_IM_WR2120_C 7 WR2120 Configuration...