![Fluidigm CyTOF XT Скачать руководство пользователя страница 138](http://html1.mh-extra.com/html/fluidigm/cytof-xt/cytof-xt_user-manual_2308832138.webp)
Appendix B: Recommendations for Extended Shutdown
CyTOF XT Startup Procedure
138
CyTOF XT User Guide
CyTOF XT Startup Procedure
1
If the argon supply was on during the instrument shutdown, proceed to Step 2.
Otherwise, turn on argon gas supply 2 hr prior to restarting CyTOF XT. This allows the
instrument to achieve the necessary vacuum levels.
2
Turn on the system circuit breaker located on the right side of the instrument.
3
Press the illuminated
Vacuum
button, located on the right side of the instrument, to turn
on the vacuum pumps.
NOTE
In the
status panel
, the vacuum and turbopump LEDs turns green within
approximately 15 min. The TOF vacuum LED may take several hours to reach ready
(green LED) state.
4
Turn on the
RFG
power circuit breaker, located on the right side of the instrument.