eCO Premium™ - Installation & Maintenance
5
FläktGroup DC_9604GB_20190327_R6
Specifications are subject to alteration without notice
11. CEILING INSTALLATION SIZES 1 - 4
10. eCO PREMIUM UNIT LAYOUTS
SERVICES SIDE VIEW
eCO PREMIUM UNIT LAYOUTS, CEILING INSTALLATION
1. 100% By Pass Damper
6. Post Heater (Enhanced
2. Filters
and Elite Version)
3. Control Box
7. Counter flow plate
4. Connection Water trap
heat exchanger
5. Supply Fan
8. Drainage Tray
9. Exhaust Fan
MAINTENANCE SIDE VIEW
UNIT OUTLINE
12. CEILING INSTALLATION SIZES 5 - 6.
1. Drop rod (not supplied)
2. M10 Nut (not supplied)
3. M10 Shake Proof Washer (not supplied)
4. Mounting Bracket (supplied)
The eCO Premium energy recovery unit is equipped with four
mounting brackets, which can be used in conjunction with
threaded drop rods or suspension chains, in order to facilitate
ceiling fastening and levelling. We recommend that the unit is
fitted and fastened into its correct position before making con-
nections to ductwork, condensate discharge pipe work (on the
exhaust air side) or electrical connections.
Attached duct work should be supported independent of the unit.
Connections to the mains electrical supply should be made via
the terminal block within the unit control panel.
It is not recommended that unit sizes 5 & 6 are to suspended
from a ceiling. If it is required to do so then it must be supported
from underneath using bearers and drop rods ensuring that they
are capable of taking the weight of the unit. Consideration must
be given when supporting the unit that access is still available for
maintenance purposes and removal of filters.
1
2
3
4
3
2
2
3
1
6
7
8 9
5
4
Fan
Fan
Exchanger
Drain
Heater
Filters
Filters
Controls
Mounting brackets
Drop rods
Drop rods
Bearers
See page 32 for minimum maintenance and service space.
Supply
air
Fresh
air