26
LOADING (FOR WOOD FIBER MULCH, IF LIMING SEE LIMING WITH
THE HYDROSEEDER
®
SECTION)
Keep hands and arms away from tank interior and agitator. Failure to
comply will result in serious injury or death.
Take care not to lose pens, lighters, etc. from shirt pockets, or drop
pieces of paper or plastic bags into the tank, as these might plug the
slurry system. Failure to comply could result in death or serious injury. Failure to comply
could also result in product or property damage.
1. With pump clutch disengaged (turned off) and agitator control in the
NEUTRAL
position, start engine and allow it to warm up. See STARTING PROCEDURE section.
2. After engine has warmed up, turn on the hydraulic system by flipping the hydraulic
toggle switch to the
HYDRAULICS ON
position (all the way up). The switch will
automatically center itself, which is the
ON
position.
3. Start filling unit with water. When water reaches the top of the agitator shaft, move
agitator control to full
REVERSE
position.
Fill tank using one of the sources of water as follows:
A. Water from any stream or pond using a fill pump. When filling from a pond or
stream, be sure to use a suction strainer to filter out contaminants that could
damage the pump and unit.
B. Any pressure source, e.g. fire hydrant. This unit is supplied with a 6 in. (15.2cm) air
gap fill port. Consult with local authorities before using water main in order to abide
by all local ordinances.
C. Water tanker.
4. Piping System Cleanout Procedure (Purging Line):
A. Remove discharge nozzle and gasket from discharge boom.
B. Aim discharge boom assembly into an open area away from any persons,
obstructions, or high voltage power lines.
C. Open discharge valve and close recirculation valve.
D. Engage (turn on) pump clutch with a firm snap. Do NOT allow clutch to slip.
E. Increase engine speed to approximately 1/2 to 3/4.
F. When discharge stream is clear, flush out hose on reel (if applicable), open
recirculation valve, and close discharge valve. After recirculation stream is clear,
disengage (turn off) pump clutch.
G. Replace nozzle and gasket in discharge boom.
5. Continue filling tank with water.
6. Increase engine speed to full RPM. Governed speed of the engine on the FINN
HydroSeeder® should be 2,500 RPM under load.
Содержание HydroSeeder T170 ML
Страница 27: ...21 DISPLAY LIST SINGLE DATA FORMAT DUAL DATA FORMAT MISCELLANEOUS DISPLAYS ...
Страница 46: ...40 12 6 1 5 3 4 3 7 11 9 8 2 9 10 Figure 9 Lubrication and Adjustment Points ...
Страница 50: ...44 8 ft 10 in 269 cm 16 ft 8 in 508 cm 7 ft 9 in 236 cm ...
Страница 52: ...46 NOTES ...
Страница 58: ...T170 ML2016 Rev A WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE 52 1 3 4 5 2 6 7 8 2 ...
Страница 64: ...T170 ML2016 Rev A WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE 58 1 2 3 4 5 6 7 8 9 10 11 ...