![Festo BV-100 Series Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/festo/bv-100-series/bv-100-series_operating-instructions-manual_2283628034.webp)
Dismantling and repair
•
Order wearing parts kit if you wish to
renew the clamping devices.
•
First replace both diaphragms, other-
wise differences in tension forces
may occur between the clamps.
•
Proceed as follows:
Dismantling the clamps:
1. Ventilate the BV.
2. Unscrew the protective hood.
3. Remove the screws (9).
4. Remove the clamps.
Replacing the diaphragms:
1.
Remove the screws in the
covers (C).
2.
Remove the covers from the BV.
3.
Remove both plates (D) together with
the diaphragm (F) and spring washer
(E) from the supports.
4.
Clean both open cavities by
blowing them out.
5.
Insert the new diaphragms in the
openings.
6.
Screw the covers on again but
do
not tighten.
Ausbau und Reparatur
•
Bestellen Sie einen Verschleißteil-
satz, wenn Sie die Spannvorrichtun-
gen erneuern wollen.
•
Wechseln Sie beide Membranen zu-
gleich aus, sonst treten möglicherwei-
se Spannkraftdifferenzen zwischen
den Zangen auf.
•
Gehen Sie wie folgt vor:
Abbau der Zangen:
1.
Entlüften Sie den BV.
2.
Schutzgitter abschrauben
3.
Schrauben (9) herausdrehen
4.
Spannzangen abnehmen
Erneuerung der Membranen:
1.
Schrauben für die Abdeckungen (C)
herausdrehen
2.
Abdeckungen vom BV abnehmen
3.
Beide Platten (D) samt Membran
(F) und Federring (E) aus den Auf
nahmen herausnehmen.
4.
Beide offen liegenden Hohlräume
durch Ausblasen reinigen.
5.
Neue Membranen in die Öffnungen
einlegen
6.
Abdeckungen
leicht
anschrauben
9
(9)
(C)
(D)
(E)
(F)
Bild 55/Fig. 55
BV-100.../BV-200...
0404a
D/GB 34