Filtration Learning System
4
© Festo Didactic
696684
8.6 Stirrer ____________________________________________________________________________ 28
8.7 Pump _____________________________________________________________________________ 29
8.8 3-way ball valve unit ________________________________________________________________ 29
8.9 Gate valve and butterfly valve _________________________________________________________ 30
8.10 Level monitoring __________________________________________________________________ 31
8.10.1 Capacitive proximity sensors _____________________________________________________ 31
8.10.2 Float switch, lateral installation ___________________________________________________ 32
8.11 Compressed air supply _____________________________________________________________ 32
8.12 Electrical connection technology _____________________________________________________ 33
8.12.1 Connection board ______________________________________________________________ 33
8.12.2 Mounting frame _______________________________________________________________ 34
frame _____________________________________________________________________ 35
8.13 PLC EduTrainer Universal S7-1512C ___________________________________________________ 36
8.14 Control console with operator unit TP700 Comfort _______________________________________ 37
8.15 EasyPort and FluidLab-PA closed-loop V5 ______________________________________________ 37
8.16 USB device server _________________________________________________________________ 38
8.17 Trolley 700 _______________________________________________________________________ 38
9 Function ______________________________________________________________________________ 39
9.1 Function as individual station _________________________________________________________ 39
9.2 Operation as a downstream station ____________________________________________________ 39
10 Sequence description __________________________________________________________________ 40
10.1 Sequence description, filter process __________________________________________________ 40
10.2 Start-up prerequisites ______________________________________________________________ 40
10.2.1 individual station ______________________________________________________________ 40
10.2.2 Station with downstream station __________________________________________________ 40
10.2.3 Rinsing process ________________________________________________________________ 40
10.3 Initial position ____________________________________________________________________ 40
10.4 Sequence ________________________________________________________________________ 40
10.4.1 Automatic mode without downstream station _______________________________________ 40
10.4.2 Automatic mode with downstream station __________________________________________ 41
10.4.3 Automatic operation, rinsing process ______________________________________________ 41
10.4.4 Manual mode _________________________________________________________________ 42
11 Commissioning _______________________________________________________________________ 43
11.1 Workstation ______________________________________________________________________ 44
11.2 Filling and emptying ________________________________________________________________ 44
11.3 Power supply _____________________________________________________________________ 45
11.4 Compressed air supply _____________________________________________________________ 45