![Festo 8079862 Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/festo/8079862/8079862_operating-instructions-manual_2284236048.webp)
Commissioning
Filtration Learning System
48
© Festo Didactic
696684
Procedure
•
Connect the sockets Q4 and GND of the downstream station to the sockets I6 and GND of the upstream
station
Further MPS PA stations are connected to each other according to the same principle.
Figure 28: Communication connection between 19
″
frames on several MPS PA stations
11.5.4
Load sample project
Siemens S7-1500 CPU1512C
For example, use an EduTrainer Universal with Siemens S7-1500 CPU1512C.
Programming software: Siemens STEP7 version 14 (SP1) or higher
1.
Connect the PC and PLC with the network cable
2.
Switch on the power supply
3.
Switch on the compressed air supply
4.
Unlock emergency stop switches (if present)
5.
Reset the memory of the PLC
6.
Set the CPU switch to the STOP position
7.
Start the TIA-Portal development environment
8.
Unarchive the file, e.g.,
MPS-PA_V2-4_CPU1512C_TP700_XXX.zap14
in directory
...\MPS-PA_Sources_V2-4\PLC&HMI\S7-1500_TP700 of the supplied CD-ROM.
9.
Load the project into the PLC. Help can be found at
10.
Set the CPU switch to the RUN position