
Operation
4812165801.pdf
2024-04-22
Fig. Rotating beacon
6. Knob
7. Lamp holder
8. Warning light
8
7
6
Now loosen the knob (6) with the other hand and fold
down the lamp holder (7).
Undo and remove any warning light (8) from the lamp
holder.
To raise the rotating beacon, perform the above
procedure in reverse.
The rotating beacon should always be folded
down before transport, where the total height of
the trailer is less than three meters.
The rotating beacon should always be folded
down before transport, where the total height of
the trailer is less than three meters.
Prior to starting work, make sure that the rotating
beacon is not damaged and in working order. If
not, replace immediately.
Prior to starting work, make sure that the rotating
beacon is not damaged and in working order. If
not, replace immediately.
69
Содержание DYNAPAC CX8
Страница 2: ......
Страница 12: ...e 4812165801 pdf 2024 04 22 Compressor Replacing V belt 166...
Страница 16: ...Introduction 4812165801 pdf 2024 04 22 4...
Страница 36: ...Technical specifications 4812165801 pdf 2024 04 22 24...
Страница 46: ...Machine description 4812165801 pdf 2024 04 22 4812129673 Warning CALIFORNIA Proposition 65 34...
Страница 72: ...Machine description 4812165801 pdf 2024 04 22 60...
Страница 110: ...Operation 4812165801 pdf 2024 04 22 98...
Страница 140: ...Maintenance Every 10h 4812165801 pdf 2024 04 22 128...
Страница 142: ...Maintenance Every 50h 4812165801 pdf 2024 04 22 130...
Страница 146: ...Maintenance Every 250h 4812165801 pdf 2024 04 22 134...
Страница 164: ...Maintenance Every 1000h 4812165801 pdf 2024 04 22 152...
Страница 179: ......
Страница 180: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...