1
2
1
2
English
27 EN
BODYWORK - This operation must be carried out at the end of each working day
Use a soft cloth and cleaning products WITHOUT ammonia
RUDEUDVLYHVUHPRYLQJDQ\RUJDQLFUHVLGXHSUHVHQWLQWKH
work area.
Note: Do not spray liquids into the panel slots.
DRAINING TRAY
- This operation must be carried out every 7 days
1.
$IWHUUHPRYLQJWKHEDVLQUHPRYHWKHOLGRIWKHGUDLQLQJ
tray.
2. Remove any residue with a sponge and rinse well with
cold water.
- This operation must be carried out at the end of each
working day
3RXU DERXW D OLWUH RI KRW ZDWHU LQWR WKH GUDLQLQJ WUD\ WR
remove any discharge residues.
127(WKHSURFHGXUHVGHVFULEHGEHORZFDQDOVREHFDUULHGRXWZKHQWKHPDFKLQHLVVZLWFKHGRႇ
GRILLE AND DRIP BASIN - This operation must be carried out at the end of each working day
1.
5HPRYHWKHJULOOHIURPWKHEDVLQ
2.
([WUDFWWKHEDVLQ
3. Rinse the grille and tray under running water.
Danger of burns
DO NOT
LQVHUW\RXUKDQGVEHQHDWK
the front panel.
HOT-WATER NOZZLE - This operation must be carried out at the end of each working day
Using a clean sponge, wash with hot water removing any
organic residue present. Rinse carefully.
'2127XVHDEUDVLYHSURGXFWV
Содержание PRESTIGE +
Страница 4: ...1 1a 21 20 2 19 18 17 17a 2 2a 17 10 PRESTIGE A 4 5 6 7 8 9 S 11 22 16 _ _ 15 OK 14 10 12 13 II...
Страница 8: ...VI This page is intentionally left blank HWWH SDJH HVW GpOLEpUpPHQW ODLVVpH YLHUJH...
Страница 44: ...English 1 This page is intentionally left blank...
Страница 80: ...Fran ais 36 FR Cette page est d lib r ment laiss e vierge...
Страница 83: ...A B C D E...