A1000
35
532210 04 - Rev.A
38
Left leaf
Right leaf
Left leaf
Right leaf
Tr
ansla
tion of the original instruc
tions
ENGLISH
Tr
ansla
tion of the
original instruc
tions
ENGLISH
Double leaf with rM = 1
(Default)
11.1 MOUNTING THE BELT
Close the leaves at the centre line (closing point in case of single leaf ).
Move the leaves by hand and ensure the movement is smooth and
friction-less along the stroke.
!
It is mandatory to use a FAAC belt for the A1000
1. Place one end of the belt over the pulley of the motor. Fasten the
two ends using the fittings
38
(1) and screws
38
(2).
2. Position the assembled fitting with the belt on the carriage. Keep
to the positions indicated in
38
and fasten using the screws
38
-
.
In case of double leaf, the belt joint must be fastened on the lower fitting
(on the left leaf).
The position of the belt fitting determines the opening direction.
3. Position the belt also on the pulley of the second motor.
11. ASSEMBLE THE BELT, CASING AND ACCESSORIES
RISKS
PERSONAL PROTECTIVE EQUIPMENT
REQUIRED TOOLS
8
6
Do not place hands between: the pulley and belt or between the sliding
guide and carriage wheels.
Double leaf with rM = -1
Passage opening
Passage opening
Содержание A1000
Страница 1: ...A1000 EN16005 2012 E1SL fw 3 0 SDK EVO fw 3 0 LK EVO fw 1 2...
Страница 108: ...A1000 108 53221004 Rev A Translation of the original instructions ENGLISH...
Страница 110: ...A1000 110 53221004 Rev A...
Страница 114: ...A1000 114 53221004 Rev A...
Страница 115: ...Translation of the original instructions ENGLISH...