A1000
19
532210 04 - Rev.A
5
37,5
37,5
37,5
38
Tr
ansla
tion of the original instruc
tions
ENGLISH
6. ASSEMBLING THE HEAD SECTION
If the A1000 KIT has been supplied, the components must be installed on
the support profile. This operation is performed in the shop. The assembled
head section is then moved to the installation site.
For handling instructions see
17
.
RISKS
PERSONAL PROTECTIVE EQUIPMENT
REQUIRED TOOLS
Ø 18 mm
6-8-10-13
5
!
A torque wrench must be used to achieve the specified fastening torques
(Nm).
For manual lifting, arrange for an adequate number of people for the
weight of the leaf: 1 person for every 20 kg to be lifted.
Содержание A1000
Страница 1: ...A1000 EN16005 2012 E1SL fw 3 0 SDK EVO fw 3 0 LK EVO fw 1 2...
Страница 108: ...A1000 108 53221004 Rev A Translation of the original instructions ENGLISH...
Страница 110: ...A1000 110 53221004 Rev A...
Страница 114: ...A1000 114 53221004 Rev A...
Страница 115: ...Translation of the original instructions ENGLISH...