Page | 45
12.3.3.
Install a round threaded insert into one end of each 1-
1/2” diameter x 1
-
1/4” long tube
(FIG. 12.5). Use a rubber mallet to fully seat the threaded inserts into tubes.
12.3.4.
Hold one 1-
1/2” diameter x 1
-
1/4” long tube with the threaded insert to the inside of the
guard wall (tube will be oriented toward the guard wall post or top rail and the insert will
be oriented toward the other side of the platform
). Install a 5/16”
-
18 x 3” long hex cap
screw through hole previously drilled and into threaded insert (FIG. 12.5). Tighten securely.
12.3.5.
FIG. 12.5 shows the correct orientation. Repeat for the other guard wall post or top rail.
FIG. 12.5
12.3.6.
Locate closure elbows and disassemble by removing screws and nuts (FIG. 12.6).
12.3.6.1.
Install elbow halves without the threaded holes into both ends of the 1-
1/2”
diameter x 46” long
platform safety rail tube (FIG. 12.6).
12.3.6.2.
Ensure rounded side of the elbow halves are facing the same direction in both
ends, and then tighten internal set screws with an Allen wrench or similar tool
(FIG 12.6).
12.3.6.3.
Insta
ll elbow halves with threaded holes onto the portion of the 5/16”
-
18 x 3”
long hex cap screw which extends past the threaded inserts (FIG. 12.6). Tighten
securely.
FIG. 12.6
Содержание Passport PL44SP3651
Страница 27: ...Page 27 FIG 9 1 FIG 9 2 ...
Страница 65: ...Page 65 23 ELECTRICAL DRAWING ...
Страница 66: ...Page 66 WIRING DIAGRAM 44 52 72 120 144 AND 168 PASSPORT LIFT ...