background image

Page | 1 

PASSPORT® Vertical Platform Lift (VPL) 

Installation Manual 

Models: PL44SP3651, PL44TP3860, PL52SP3651, PL52TP3860, PL72SP3651, & PL72TP3860 

Manufactured in the USA

2-year Warranty. Please register at www.ezaccess.com/warranty-satisfaction.

© EZ-ACCESS

®

, a division of Homecare Products, Inc.  

All rights reserved.

All text and images contained in this document are proprietary and may not be shared, modified, distributed, 

reproduced, or reused without the express written permission of EZ-ACCESS. 

12274 11-22-19 

Содержание Passport PL44SP3651

Страница 1: ...ed in the USA 2 year Warranty Please register at www ezaccess com warranty satisfaction EZ ACCESS a division of Homecare Products Inc All rights reserved All text and images contained in this document are proprietary and may not be shared modified distributed reproduced or reused without the express written permission of EZ ACCESS 12274 11 22 19 ...

Страница 2: ...TRAIGHT PLATFORM PL44TP3860 44 MAXIMUM HEIGHT TURN PLATFORM PL52SP3651 52 MAXIMUM HEIGHT STRAIGHT PLATFORM PL52TP3860 52 MAXIMUM HEIGHT TURN PLATFORM PL72SP3651 72 MAXIMUM HEIGHT STRAIGHT PLATFORM PL72TP3860 72 MAXIMUM HEIGHT TURN PLATFORM ...

Страница 3: ... EQUIPMENT TOP LANDING GATE CONNECTOR TO PATHWAY HANDRAIL 35 40 SECTION 11 OPTIONAL EQUIPMENT TOP LANDING GATE CONNECTOR TO WOOD DECK 41 42 SECTION 12 OPTIONAL EQUIPMENT PLATFORM SAFETY RAIL 43 46 SECTION 13 OPTIONAL EQUIPMENT PLATFORM SAFETY PAN WEATHER GUARD 47 SECTION 14 OPTIONAL EQUIPMENT INTERLOCK 48 51 SECTION 15 OPTIONAL EQUIPMENT CALL SEND CONTROL 52 53 SECTION 16 OPTIONAL EQUIPMENT CALL S...

Страница 4: ...y upon receipt and note any freight damage on freight bill while driver is still present Contact shipper right away with any freight damage concerns In most cases freight damage claims will not be allowed unless noted on the freight bill Pictures of damage before the unit is unpacked can be very helpful REQUIRED TOOLS 1 8 ALLEN WRENCH 9 16 OPEN BOX END WRENCH SOCKET 7 32 ALLEN WRENCH ADJUSTABLE CR...

Страница 5: ... and bracing drawing details if required are the responsibility of the installer The installer must ensure that the structure the VPL braces if required will be mounted to and the reinforced concrete pad the VPL will be anchored to are of adequate structural integrity as determined by the installer and the authority having jurisdiction AHJ local to the VPL installation site The VPL platform guard ...

Страница 6: ...tact your dealer to schedule inspections repairs or service Observe and avoid all pinch points Whenever not actively raising or lowering the VPL turn keyed power switch to OFF position and remove key Always unplug VPL from electrical outlet before cleaning Only plug VPL back in when area around VPL is dry Never operate VPL with damaged electrical wires cords or plugs The VPL s electrical cord must...

Страница 7: ...PIVOT ARM ASSEMBLY PLATFORM ATTACHMENT NUT 5 16 18 LOCKNUT 4 PIVOT ARM ASSEMBLY PLATFORM ATTACHMENT NUT 5 16 18 LOCKNUT 4 PLATFORM ATTACHMENT BOLT 5 16 18 X 1 1 2 LONG HEX BOLT 2 PLATFORM ATTACHMENT BOLT 5 16 18 X 1 1 2 LONG HEX BOLT 2 GUARD RAMP ACTIVATING BAR ASSEMBLY ATTACHMENT BOLT 5 16 X18 X 1 LONG HEX BOLT 4 GUARD RAMP ACTIVATING BAR ASSEMBLY ATTACHMENT BOLT 5 16 X18 X 1 LONG HEX BOLT 4 SIDE...

Страница 8: ...ion is required by the VPL owner and is essential for safe operation Labels are pre installed and positioned as shown FIG 2 1 These labels may vary in color border style size and written content For replacement copies please contact your dealer or call 1 800 451 1903 FIG 2 1 ...

Страница 9: ...ood switch contacts to close enabling control voltage to the control box 4 4 When the hood is removed the magnet is no longer in proximity to the switch causing the switch to open disabling control voltage to the control box 4 5 When servicing the VPL the installer may find it necessary to enable the control circuit power with the hood off This can be accomplished as follows FIG 4 2 4 5 1 Unplug C...

Страница 10: ...tform will have the guard ramp the guard ramp activating bar must always be installed on the same side as the guard ramp 5 6 Attach the guard ramp activating bar in the two open holes on the corresponding side of the tower using two 5 16 18 x 1 long attachment bolts There are two holes in the tower used for mounting the guard ramp activating bar which do not have fasteners in them This is normal s...

Страница 11: ...lift unsafe or inoperable 5 8 2 Install two 5 16 18 x 1 1 2 attachment bolts and locknuts through the mating holes in the platform assembly and the carriage side plate FIG 5 2 Tighten securely 5 8 2 1 The outer cable clamp holding the control box wire bundle may need to be temporarily removed from the carriage to fully engage the platform tubes If control box wire bundle is removed it must be rein...

Страница 12: ...with 5 16 18 locknut FIG 5 4 This screw must be installed to prevent the guard ramp from contacting the guard wall 5 8 5 Locate the guard ramp guard ramp pivot plates 1 4 20 x 1 2 pivot plate attachment bolts and guard ramp spacers 5 8 6 Slide the pivot plates and spacers over the ramp torque tubes as shown FIG 5 4 5 8 7 Position the guard ramp with pivot plates on the entry side of the platform a...

Страница 13: ...arm There are two bolt holes in the pivot arm One centers the roller under the guard ramp activating bar for the straight platform and the other centers the roller under the guard for the turn platform 5 8 10 Secure with 5 16 18 x 2 hex bolt and locknut installed in the orientation shown FIG 5 5 5 8 11 Verify that the roller is positioned beneath the guard ramp activating bar The roller will conta...

Страница 14: ...e platform FIG 5 6 Loosen two set screws in each platform corner pocket as needed to fully engage the guard wall posts Tighten all set screws securely after the guard walls are installed Ensure guard wall with two holes in top rail is installed closest to the tower FIG 5 6 FIG 5 6 ...

Страница 15: ...s from control box mounting frame posts FIG 5 7 Installation of the control box mounting frame is the same for the turn platform and the straight platform 5 8 14 Using provided nuts and bolts install the mounting frame between the guard wall and tower oriented as shown FIG 5 7 Tighten securely FIG 5 7 ...

Страница 16: ...ee the control box 5 8 16 Remove fasteners securing mounting channels to control box 5 8 17 Position control box into the mounting frame as shown FIG 5 8 and reinstall the mounting channels using the fasteners removed in the previous step 5 8 18 Ensure that the control box is free to slide the entire length of mounting frame ...

Страница 17: ...cket securely 5 9 4 Install 5 16 18 x 2 ss button head screw on pivot plate and secure with 5 16 18 locknut FIG 5 10 This screw must be installed to prevent the guard ramp from contacting the guard wall FIG 5 9 FIG 5 10 5 9 5 Install the guard ramp by first inserting the outer torque tube into the hole in the welded pivot plate assembly 5 9 6 Install the pivot plate over the torque tube on the opp...

Страница 18: ...ide toward the inside of platform FIG 5 11 5 9 9 Loosen the two set screws in each of the platform corner pockets closest to the lift tower as needed to fully engage the guard wall posts Tighten all set screws securely after the guard wall is installed FIG 5 11 ...

Страница 19: ...en the two set screws in the remaining open platform corner pocket as needed to fully engage the guard wall post 5 9 10 2 Align the threaded inserts in the side guard wall with the holes in the rear guard wall post and install two 5 16 18 button head socket cap screws through the rear guard wall post into the threaded inserts Tighten securely 5 9 10 3 Tighten platform corner pocket set screws secu...

Страница 20: ...l box is in the Power Off position 6 5 With no one standing on the platform locate and connect the white wire there should only be one open terminal on the batteries see FIG 6 1 6 5 1 The VPL will not operate when the wire is connected to the battery when the keyed switch is the Power Off position However in case of unexpected operation be sure you are positioned to prevent injury A small amount o...

Страница 21: ...he Top Landing Gate has been completely installed 7 7 Anchor the VPL using four 1 2 x 3 1 2 Red Head Trubolt Wedge or Trubolt Seismic Wedge concrete anchors or equivalent not supplied Follow the anchor manufacturer s instructions for proper installation of concrete anchors Ensure anchor tops do not interfere with platform operation 7 7 1 The legs of the VPL are pre drilled with four 5 8 holes 40 o...

Страница 22: ...ghten Do Not overtighten two flat head adjustment screws Use only a 1 8 Allen Wrench on the Limit Switch Trigger screws or the screw head may strip 7 15 Raise the VPL platform until it stops and the ENTER EXIT indicator illuminates 7 16 Check the height alignment between the upper landing and the platform deck then fine tune by adjusting limit switch trigger up or down as needed Final height shoul...

Страница 23: ...engths 8 2 1 108 for standard VPL heights up to and including 72 8 2 2 199 for standard VPL heights over 72 8 3 INSTALLATION 8 3 1 If connected disconnect the 12 volt AC power cord from the receptacle 8 3 2 If connected disconnect the white wire there is only 1 white battery wire from the battery terminal 8 3 3 Refer to the wireless remote parts list FIG 8 1 8 3 4 Refer to GAMA receiver receiver m...

Страница 24: ...install the antenna drop antenna cable down through the VPL s tower wire channel FIG 8 4 8 3 6 1 Note the location of the hook and loop fastener on the underside of the antenna FIG 8 5 FIG 8 3 FIG 8 4 FIG 8 5 GROUND WIRE BLACK 8 32 THREAD CUTTING SCREW X2 PROGRAMMING LED GAMA RECEIVER ...

Страница 25: ...to stick the antenna in place FIG 8 6 8 3 8 Plug the antenna into the receiver FIG 8 7 8 3 9 Stow excess antenna cable neatly and securely away from all VPL moving parts 8 3 10 Install splitter FIG 8 8 by plugging it into the VPL options plug and the receiver plug FIG 8 9 FIG 8 6 COMPONENTS REMOVED FOR CLARITY FIG 8 7 FIG 8 8 FIG 8 9 ...

Страница 26: ...ealer for service if the top landing gate does not fully close unassisted and do not use until repairs have been completed by an EZ ACCESS approved technician 9 2 TOP LANDING GATE WITH TURN PLATFORM 9 2 1 When using a top landing gate with a turn platform the gate latch must be on the same side as the side guard wall FIG 9 1 The top landing gate will not span the entire length of a turn platform a...

Страница 27: ...Page 27 FIG 9 1 FIG 9 2 ...

Страница 28: ... the platform aligns with the latch roller on the top landing gate without hitting the latch FIG 9 3 9 4 6 1 It is recommended that this be done with weight on the VPL platform approximately equal to the VPL user s weight since the platform has a built in 1 angle which may affect the alignment 9 4 7 Once the top landing gate is positioned correctly attach to the porch or deck FIG 9 3 ...

Страница 29: ...ll to the deck fascia FIG 9 4 9 4 9 Install four screws two per side and two bolts one per side as shown FIG 9 4 9 4 9 1 If the top landing gate is being attached to a concrete porch or deck these screws and bolts will need to be replaced with concrete anchors and alternate fasteners of the same size not included Follow the concrete anchor and alternate fasteners manufacturer s installation instru...

Страница 30: ... at the back of the VPL 9 4 13 Secure the top landing gate cord to porch or deck in such a manner that it will not interfere with the VPL or top landing gate operation nor pose a tripping hazard 9 4 14 Run the VPL platform down below the landing by approximately 12 9 4 15 Manually hold the top landing gate latch in the open position while simultaneously depressing the UP button on the control box ...

Страница 31: ...ket clamp screws holding the latch mounting clamp plate just enough that the latch assembly will move but do not remove clamp screws completely It may be necessary to manually rotate the latch out of the way to access the clamp screws 9 4 18 4 Move the latch assembly up or down the same distance the top landing gate was moved and re tighten the clamp screws securely The ring magnet attached to the...

Страница 32: ...sure that you have the properly handed left or right latch cover for the gate Always test fit prior to beginning installation 9 5 1 1 1 If the gate opens to the left as you exit the VPL platform use a LEFT latch cover FIG 9 7 9 5 1 1 2 If the gate opens to the right as you exit the VPL Platform use a RIGHT latch cover FIG 9 8 FIG 9 6 FIG 9 7 LEFT OPENING FIG 9 8 RIGHT OPENING ...

Страница 33: ...e outside of the gate FIG 9 9 9 5 2 3 Verify that the upper strike rod will clear the latch cover and engage with the latch when cut at the mark 9 5 2 3 1 Place the latch cover over the latch mechanism and flush with the gate post referring to FIG 9 12 for orientation 9 5 2 4 Cut the upper strike rod 9 5 2 5 Use a file to deburr all sharp edges FIG 9 9 LEFT HANDED GATE SHOWN ...

Страница 34: ... from latch post and set aside for later use FIG 9 10 9 5 3 2 Attach mounting plate loosely to the back side of the latch cover with provided 5 16 18 x 1 2 button head socket cap screw FIG 9 11 9 5 3 2 1 Screw head can be accessed via the access hole FIG 9 12 FIG 9 11 FIG 9 10 ...

Страница 35: ...nd the latch mechanism clamp plate Note the orientation of the mounting plate in post channel 9 5 3 4 Secure latch cover by tightening the 5 16 18 x button head socket cap screw accessed via the screw access hole against the inside of the post channel FIG 9 12 9 5 3 5 Place gate post cap back on latch post FIG 9 10 9 5 3 6 Test the gate for proper functionality and adjust latch cover up or down if...

Страница 36: ...kit FIG 10 1 includes two 1 1 2 diameter handrail tubes two connector plates two clamp plates and attachment hardware FIG 10 1 If connecting both gate posts to platform handrail posts use two kits The 1 1 2 diameter handrail tubes are sized for larger 6 platforms and are typically cut to fit others 10 2 2 Install the PATHWAY platform per PATHWAY instructions in the desired location 10 2 3 Do not i...

Страница 37: ...ere disassembled for cutting reassemble the connector plate to the handrail tube and assemble the clamp plate to the connector plate using two 5 16 18 x 3 4 long button head socket clamp screws through the larger holes in the connector plate and into the tapped holes in the clamp plate 10 2 12 1 Do not tighten fully at this time 10 2 13 Orient the connector plate as shown FIG 10 3 with the clamp p...

Страница 38: ...ttach the open end of the handrail tube to the platform post and tighten the 5 16 18 x 3 4 long button head socket clamp screws securely 10 2 16 Repeat the procedure for the upper handrail tube 10 2 17 Reinstall the post cap and insert the 3 8 push in plugs in the open holes between the hex washer head screws in the platform post FIG 10 3 FIG 10 3 ...

Страница 39: ...uct this fascia and confirm it meets applicable building codes FIG 10 4 10 3 4 Install Top Landing Gate per instructions in SECTION 9 10 3 5 Assemble one of the handrail tubes to a connector plate using two 10 x 1 long self tapping hex washer head screws 10 3 6 Hold the connector plate with handrail tube against the outside of the gate post where it will be attached and mark the handrail tube at t...

Страница 40: ... plate inside the channel and the connector plate on the outside of the post Slide down until the 5 15 18 threaded hole of the round tube insert aligns with the hole in the platform rail post FIG 10 5 and insert a 5 16 18 hex head bolt thorough the platform angle post and threading it into the threaded hole of the round tube insert 10 3 11 1 Do not tighten fully at this time 10 3 12 Repeat the pro...

Страница 41: ...ECTOR TO WOOD DECK 11 1 OVERVIEW 11 1 1 This option is used to tie the top landing gate post to handrails or posts on an existing wood porch or deck Each connector includes two clamp plates two angle connectors and attachment hardware FIG 11 1 FIG 11 1 ...

Страница 42: ...where they will be attached to the existing rail or post Use the slots as a guide to mark where holes in the existing rail or post will be drilled Slide the assembly out of the way and drill 5 16 or 11 32 holes through the existing rail or post in the marked locations 11 1 5 Reposition the connector assembly to align the slots in the angle connector with the holes drilled in the previous step then...

Страница 43: ...alls install only on the inside of the front or rear guard walls The inside is the platform side of the guard walls not outside the platform 12 2 BEFORE YOU BEGIN 12 2 1 When used with a straight platform the platform safety rail can be installed on the inside of either the front guard wall FIG 12 1 or rear guard wall FIG 12 2 12 2 1 1 Determine which location will be more convenient for the inten...

Страница 44: ...pposite post 12 3 1 2 Drill 3 8 diameter holes through both posts at the marked locations FIG 12 3 12 3 2 TURN PLATFORM 12 3 2 1 Measure 5 3 16 in from the end of one rear guard wall post and make a mark on the rear guard top rail Next measure 1 down from the top of the rear guard wall top rail and mark Find the location where the two marks cross Mark a location on the other end of the rear guard ...

Страница 45: ...ert FIG 12 5 Tighten securely 12 3 5 FIG 12 5 shows the correct orientation Repeat for the other guard wall post or top rail FIG 12 5 12 3 6 Locate closure elbows and disassemble by removing screws and nuts FIG 12 6 12 3 6 1 Install elbow halves without the threaded holes into both ends of the 1 1 2 diameter x 46 long platform safety rail tube FIG 12 6 12 3 6 2 Ensure rounded side of the elbow hal...

Страница 46: ... 12 3 6 5 Assemble the 1 1 2 diameter x 46 long platform safety rail tube to the guard wall by reassembling the elbows Align the holes in the elbow halves and replace the center insert then insert the elbow assembly screw through all the components on one side Repeat on the opposite side 12 3 6 6 Place elbow assembly nuts on the screws and tighten securely FIG 12 8 12 3 6 7 Ensure the platform saf...

Страница 47: ...s onto the outer edge of the safety pan until fully engaged FIG 13 2 If not fully engaged the weather guard may not hold on the safety pan 13 3 Continue pressing and forming the weather guard around the edge of the safety pan until it reaches the carriage arm on the opposite side Trim off excess and retain if needed use trimming to fill the area between the two inner carriage arms 13 4 Run the lif...

Страница 48: ...connected to a top landing gate The wiring must be returned to its original wiring scheme pre interlock alteration to work with the top landing gate 14 1 4 Interlock kit contents are shown in FIG 14 3 and FIG 14 4 FIG 14 1 FIG 14 2 ITEM DESRIPTION QTY 1 PORTA ELECTRIC EMDL 06 DOOR INTERLOCK 1 ea 2 14 FT OF 18 4 SOOW CORD WITH A METRIPACK 150 4 PIN FEMALE CONNECTOR AND A MALE SPADE CONNECTOR ON THE...

Страница 49: ...Cut 85 wire to 57 52 Cut 85 wire to 65 72 Do NOT cut leave wire at 85 120 Cut 181 wire to 133 144 Cut 181 wire to 133 168 Do NOT cut leave wire at 181 14 2 6 Strip the end of red 16 gauge wire to expose 1 4 of conductor 14 2 7 Insert stripped end of red 16 gauge wire into open end of butt connector on inline fuse holder wire FIG 14 9 Make sure conductor is fully engaged with metal tube inside butt...

Страница 50: ...all 5 16 ring terminal on yellow wire with inline fuse holder over center stud Replace nut and tighten securely FIG 14 8 and FIG 14 9 14 3 8 Route red wire attached to yellow fuse wire in FIG 14 9 down through the cable access port FIG 14 9 and run parallel to the AC power cord down the right side of lift tower behind wire hold downs FIG 8 4 String red wire down to match the length of the other tw...

Страница 51: ...ctric EMDL 06 Door Interlock manufacturer s instructions for the mounting and use of the Interlock on an existing door 14 3 17 Reattach the white 10 gauge ground wire to negative battery terminal 14 3 18 Reinstall the plastic cover on power head 14 3 19 Plug in AC power cord and turn the VPL keyed power switch to the ON position 14 3 20 Test exterior door interlock 14 3 21 With door closed operate...

Страница 52: ...g 15 2 Press the down button and the platform descends press the up button and the platform ascends 15 1 2 The keyed power switch on the control panel must be in the Power On position for the call send control to operate 15 1 3 The VPL tower is pre wired for one call send control splitter is included with additional call send controls Mount call send control in safe locations and in accordance wit...

Страница 53: ...the call send control plug and tuck the connected plug back inside the tower FIG 15 2 15 2 4 Reinstall rear cover panel ensuring that the notch is in the lower right corner looking at the back of VPL 15 2 5 Mount the call send control securely using 10 bolts or screws not included in a suitable location where it can be accessed easily by the VPL user 15 2 6 Secure the call send control cord in suc...

Страница 54: ... send control to the top landing gate post The kit includes two mounting bars one attachment bar and attachment hardware 16 2 INSTALLATION 16 2 1 Mounting must be done on the latch mounting post in the orientation shown FIG 16 1 extending away from the top landing gate on the same side as the latch bar It cannot be installed on the hinge side FIG 16 1 ...

Страница 55: ...ll send control and mounting assembly by sliding the attachment bar into the channel at the back of the latch mounting post while the mounting bars remain on the outside the post 16 2 6 Slide the assembly below the latch bar and tighten the clamp screws securely This should clamp the post wall between the attachment bar and the mounting bars holding the call send control in place 16 2 7 Reinstall ...

Страница 56: ...7 1 is used when a top landing gate latch is mounted opposite the guard wall FIG 17 1 This option replaces the welded pivot plate 17 2 INSTALLATION 17 2 1 The turn platform pivot post uses the same installation procedure s as the welded pivot plate See SECTION 5 for installation information FIG 17 1 GUARD WALL ...

Страница 57: ...specific installation and the end user s desired placement 18 2 2 Position hinges in the desired location against the platform guard end post 18 2 3 Further position the platform gate so the top of the upper tube aligns with the top of the platform guard end post Flush the outside edge of the hinge with the outside edge of the platform guard end post FIG 18 1 18 2 4 Once the platform gate and hing...

Страница 58: ...ease tension The platform gate should swing fully shut gently so as not to bounce off bumper installed in next steps more than once 18 2 6 Install the rubber bumper similarly to the hinges by drilling a 13 64 7 pilot hole through one wall of the opposite post 8 3 4 from the top and centered vertically 18 2 6 1 Attach the rubber bumper to the post using one 1 4 20 X 1 pan head Phillips self drillin...

Страница 59: ... before using the VPL Calcium chloride is often used to deice and prevent ice from forming on roads Used properly this may be useful to help rid or keep your VPL platform free of frost ice and snow Calcium chloride may not always be effective in removing frost ice and or snow 19 1 3 Weekly test and ensure that the safety pan the built in device designed to detect obstructions under the platform is...

Страница 60: ...battery is best for your particular installation KUNG LONG WP12 12 MK EAST PENN ES12 12 B B BP12 12 LEOCH DJW12 12HD EAGLE PICHER CF 12V12 UNIVERSAL UB12120 CSB GP12120 PANASONIC LC RA1212P VISION CP12100 POWER PATROL SLA1105CSB CSB GP12110F2 POWERSONIC PS 12120 20 2 BATTERY REMOVAL 20 2 1 Unplug all electrical wiring from battery terminals FIG 20 3 20 2 2 Remove locknut washer and battery mountin...

Страница 61: ...f the power head mounting plate then turn another quarter turn 20 3 4 Do not overtighten A properly tightened battery hold down will allow slight twisting movement with fingers FIG 20 2 Battery hold down will keep batteries in place with bolt nut only lightly tightened Battery hold down cannot be easily twisted with fingers when over tightened When over tightened battery cases will be visibly dist...

Страница 62: ... 5 3 Connect opposite end with 2 black wires one 10AWG and one 16AWG to Battery 2 negative terminal 20 3 5 4 Connect the White 10AWG wire to the negative terminal of Battery 1 20 3 5 5 Reconnect the 120VAC power cord to the 120VAC outlet Turn keyed switch to the Power On position and pull Emergency Stop button out 20 3 5 6 Cycle VPL up and down several inches to confirm proper battery function WHI...

Страница 63: ... 5 21 1 3 Remove either the front or rear cover panel FIG 21 1 21 1 3 1 The screw is more easily accessed by removing the rear cover panel removing both rear cover panels on lifts taller than 72 is required 21 1 4 Use a brush or similar tool to work the grease into the screw threads even the sections above and below where the carriage travels 21 1 5 Move the lift platform up or down approximately ...

Страница 64: ...r unstable surface 22 1 3 Using 4 each 1 2 x 4 concrete anchors anchor the VPL to reinforced concrete pad once it is fitted into place Always follow concrete anchor manufacturer s directions when using concrete anchors For additional anchoring information refer to the PASSPORT Vertical Platform Lift VPL Technical Specifications and the PASSPORT Vertical Platform Lift VPL Installation Supplement fo...

Страница 65: ...Page 65 23 ELECTRICAL DRAWING ...

Страница 66: ...Page 66 WIRING DIAGRAM 44 52 72 120 144 AND 168 PASSPORT LIFT ...

Страница 67: ...TROLS OPERATE LIFT AS BUTTONS INDICATE UP DOWN EMERGENCY STOP ROUTINE INSPECTIONS TEST ANNUALLY TEST REMOTE CONTROLS CONFIRM VPL OPERATES AS BUTTONS INDICATE UP DOWN ROUTINE INSPECTIONS TEST ANNUALLY TEST CONFIRM KEYED POWER SWITCH FUNCTIONS ROUTINE INSPECTIONS TEST ANNUALLY TEST CONFIRM PLATFORM STOPS AT UPPER LANDING ROUTINE INSPECTIONS TEST ANNUALLY INSPECT CONFIRM AC POWER CORD IS UNDAMAGED RO...

Страница 68: ...ASE EXPLAIN CONFIRM DOCUMENTS ARE ON SITE WIRING DIAGRAM INSTALLATION MANUAL USER MANUAL SERVICE LOG S TECH NOTES SERVICE DATE SERVICE COMPANY NAME SERVICE TECHNICIAN NAME FULL NAME PLEASE PRINT SERVICE COMPANY ADDRESS CITY ST ZIP REASON FOR SERVICE DESCRIBE SERVICE ACCIDENTS INVOLVING LIFT YES NO IF YES PLEASE EXPLAIN CONFIRM DOCUMENTS ARE ON SITE WIRING DIAGRAM INSTALLATION MANUAL USER MANUAL SE...

Отзывы: