3 Carefully slide the power supply all the way into the power supply bay, as shown in the figures
below, until the latch snaps into place.
Caution
Do not slam the power supply into the router.
Figure 53: Installing a Summit 300 W DC Power Supply (Model 10933)
Figure 54: Installing a Summit 300 W DC Power Supply (Model 10934A)
4 If power supplies are not installed in both power supply bays, install a cover over the unoccupied
bay.
The cover is required for maintaining proper system ventilation and EMI levels.
Maintaining Your Equipment
E4G Routers Hardware Installation Guide
69