The E4G-400 router is shipped with one power supply. A second power supply for redundant power
can be ordered and shipped separately.
Note
An AC power input cord is not provided with an E4G-400 AC power supply. You can order an
appropriate cord from Extreme Networks or from your local supplier. The power cord must
meet the requirements listed in
Power Supplies for the E4G-400 Router
on page 103.
The E4G-400 cell site aggregation router can be installed in either a mid-mount or front-mount position
in a standard 19-inch equipment rack.
Installing the E4G-400 Router in a Rack
The E4G-400 router is installed in a standard equipment rack. It can be installed either in a mid-mount
or a front-mount position.
For instructions on installing the router in a rack, refer to the appropriate topic:
•
Mid-Mount Installation for the E4G-400 Router
on page 47
•
Front-Mount Installation for the E4G-400 Router
on page 48
Mid-Mount Installation for the E4G-400 Router
To mid-mount an E4G-400 router in a two-post equipment rack, follow these steps:
1 On each side of the router, use six screws to attach a mounting bracket as shown in
the following
figure
.
Figure 26: Rack-mounting Bracket for Mid-Mount Installation
Installing an E4G Series Router
E4G Routers Hardware Installation Guide
47