60
HPS-III-Heißkanalsystem_Inbetriebnahme-System-Einzeldüsen-L2X-NV_BA_V-2-0_EN
Instructions for the operation of valve gate systems
•
For machine downtimes of more than 5 minutes the temperature of the hot runner system should be decreased (50°C -
60°C below processing temperature) in order to avoid thermal degradation of the material in the system.
•
Adhere to the specified heat up times.
•
When processing sensitive materials (e.g. POM) purge with a neutral material (natural material, not
coloured, e.g. polypropylene) before shutting down the machine.
•
The injection moulding machine should feature a signal input and output to read and send error messages from and to
the hot runner controller.
•
Modern hot runner controllers feature an automatic decreasing function.
6.4.1 Machine downtimes > 5 minutes of systems with HPS III-S nozzles (system / single tip / single
cavity)
Содержание L2X
Страница 2: ......
Страница 6: ...6 HPS III L2X Hei kanalsystem_Inhalt_BA_V 2 0_EN...
Страница 36: ...36 HPS III L2X Hei kanalsystem_Montage_BA_V 2 0_EN...