37
HPS-III-L2X-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of L2X Drop-in hot runner systems
5.5 Installation of L2X Drop-in hot runner systems
Picture 23: General layout of a L2X system
z347-01
Pos. 1 Manifold
Pos. 2 L2X nozzle
Pos. 5 Sprue bush
Pos. 6 Locating ring
Pos. 10 Drive unit on manifold (screwed-on) (version 1)
(for valve gate systems)
Pos. 10 Drive unit on manifold (screwed-on) (version 2)
(for valve gate systems)
Pos. 13 Screw connection for manifold
Pos. 14 Centring aid
Pos. 50 Insulating plate
Pos. 51 Clamping plate
Pos. 53 Nozzle retainer frame plate
Pos. 56 Contour plate
The positions 1 - 2 are delivered as a completely
assembled and wired system including electrical
connector box. In addition the valve gate version
includes the complete piping for the drive units
as well as a connector block for the supply lines.
Connector block for valve gate supply lines
Electrical connector box
Read operating manual
In the installation process described in the following hazards for the
personal health are listed explicitly.
Furthermore, during installation the warning, safety and installation
notes for installation of EWIKON hot runner systems and compo-
nents as specified in chapter „5.2 General safety instructions“ must
be followed!
NOTE!
Dimensional check
Before installation the installation dimensions as listed in chapter
„5.4 Checks before installation“ must be checked and compared with
the values provided with the installation drawing.
Use approved standard parts only
Only standard parts which are approved for use in EWIKON hot
runner systems must be used. See chapter „5.3 Technical Requi-
rements“.
NOTE!
Содержание L2X
Страница 2: ......
Страница 6: ...6 HPS III L2X Hei kanalsystem_Inhalt_BA_V 2 0_EN...
Страница 36: ...36 HPS III L2X Hei kanalsystem_Montage_BA_V 2 0_EN...