40
HPS-III-L2X-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of L2X Drop-in hot runner systems
Picture 28:
Check of clearance ∆S and subsequent installation
steps
z347-06
1. Let the manifold cool down to room temperature.
2. Check the clearance
∆S
between the surface of the
upper pressure pad (pos. 1.2) and the surface of the
nozzle retainer frame plate (pos. 53) and compare it to
the value given in the drawing provided by EWIKON.
3. Install the clamping plate (pos. 51) and the insulating
plate (pos. 50).
4.
Install the locating ring (pos. 6) and fix it with socket
head screws (pos. 6.1, ISO 4762 - 12.9). Tighten with
matching torque. See chapter
„9. Tightening torques“.
5. For valve gate systems:
connect the supply lines to the
connector block.
6. In order to clearly identify the hot runner system attach
the type plate included in the delivery prominently to the
operator side of the mould.
Check of clearance ∆S, installation of clamping plate and locating ring
All clearances must be checked in cold condition!
In case of deviatons the clearances must be adjusted in an appro-
priate way (e.g. by machining the nozzle retainer frame plate or the
pressure pads of the manifold).
Attention:
The adjustment must not have influence on the dimension
X of the nozzle!
NOTE!
Sharp edges and heavy components
•
Cut injuries to body and extremities, mainly to the hands.
•
Crushing of fingers or hand.
Hot surfaces
Burns to the body caused by hot surfaces.
WARNING!
Содержание L2X
Страница 2: ......
Страница 6: ...6 HPS III L2X Hei kanalsystem_Inhalt_BA_V 2 0_EN...
Страница 36: ...36 HPS III L2X Hei kanalsystem_Montage_BA_V 2 0_EN...