
1) Common installation rules and safety information regarding EURA E800 inverters
Insulation testing
In case of insulation testing of the whole network, it is recommended
to disconnect the inverter and all optionally mounted filter
components. Some components, used inside the inverter may impact
measurement accuracy, o may become destroyed
All EURA inverters have to pass the insulation test, according to
EN15178, during the final test procedure on the production line.
Potential equalization
If components with no galvanic insulation are used and connected to
the inverter, proper measures are necessary, to guarantee potential
equalization.
E800 – Rev.01 -EN- SOFT Rev. 2.04
© 2015 EURADRIVES EUROPE GmbH
- 5 -