9 CONFIGURATION MENU
0460 896 274
- 54 -
© ESAB AB 2013
9.3.2
4-stroke configuration
In 4-stroke configuration, various functions of 4-stroke start and stop can arise.
4-stroke start setting
•
Trigger-controlled gas pre-flow, see the “4-stroke” section.
•
Time-controlled gas pre-flow.
A = Gas flow
B = Wire feed
C = Gas pre-flow
D = Welding
Press in the trigger switch (1), gas pre-flow starts; after the set gas pre-flow time, the
welding process starts. Release the trigger switch (2).
•
Trigger-controlled hot start
A = Gas flow
B = Wire feed
C = Gas pre-flow
D = Hot start
E = Welding
Press in the trigger switch (1); gas pre-flow starts and hot start runs until the switch is
released (2).
4-stroke stop setting
•
Time-controlled crater filling with possible extension, see the "4-stroke" section.
•
Trigger controlled crater filling time
A = Gas flow
B = Wire feed
C = Welding
D = Crater filling
Press in the trigger switch (3); crater filling commences and expires. If the trigger switch is
released (4) within the crater filling time (crater filling time shortened), welding is interrupted.
Содержание Aristo U82
Страница 1: ...Aristo Instruction manual 0460 896 274 GB 20130902 Valid from program version 1 15A U82 ...
Страница 80: ...MENU STRUCTURE 0460 896 274 80 ESAB AB 2013 MENU STRUCTURE ...
Страница 81: ...MENU STRUCTURE 0460 896 274 81 ESAB AB 2013 ...
Страница 82: ...MENU STRUCTURE 0460 896 274 82 ESAB AB 2013 ...
Страница 83: ...MENU STRUCTURE 0460 896 274 83 ESAB AB 2013 ...
Страница 84: ...MENU STRUCTURE 0460 896 274 84 ESAB AB 2013 ...
Страница 95: ...ACCESSORIES 0460 896 274 95 ESAB AB 2013 ...