Service
Preparatory Steps
Follow the procedures which are applicable to the system. If any elements are not present, ignore
those procedures.
Tools Needed
Digital multimeter (DMM)
5 mm hex (Allen) wrench
#1 Phillips screwdriver
#2 Phillips screwdriver
Torque driver
Disconnection
Power down and disconnect all power sources from the inverter prior to performing any service.
Turn off all circuit breakers connected to the inverter.
L
OAD
circuit breaker
G
RID
circuit breaker
G
EN
circuit breaker
DC circuit breakers
Generator start circuit
Voltage Check
Once these connections are turned off, verify with a voltmeter that NO voltage is present at the DC+
to DC– terminals. Refer to Figure 37 on page 80.
WARNING: Shock Hazard and Equipment Damage
It may take time for internal capacitance to fully discharge. Ensure full discharge for at least
one minute (less than 1 Vdc) prior to continuing. The inverter’s capacitors may retain a
sizable charge, which can cause electrical shock or severe equipment damage during
normal handling. This damage is not covered under the unit’s warranty.
Содержание OutBack POWER Mojave OGHI8048A
Страница 1: ...Mojave Grid Hybrid Inverter Charger OGHI8048A Operator s Manual...
Страница 30: ...30 900 00275 01 001 Rev A 2021 OutBack Power All Rights Reserved User Interface NOTES...
Страница 48: ...48 900 00275 01 001 Rev A 2021 OutBack Power All Rights Reserved Operation NOTES...
Страница 110: ...110 900 00275 01 001 Rev A 2021 OutBack Power All Rights Reserved Specifications NOTES...
Страница 114: ...114 900 00275 01 001 Rev A 2021 OutBack Power All Rights Reserved Index This page intentionally left blank...
Страница 115: ...900 00275 01 001 Rev A 115 Index This page intentionally left blank...
Страница 116: ...900 00275 01 001 Rev A Masters of the Off Grid First Choice for the New Grid 3767 Alpha Way Bellingham WA 98226 USA...