103448-02 - 6/13
81
Viii. Electrical
(continued)
g.
Multiple Boiler Operating Information
1. Required Equipment and Setup
a. Header Sensor (p/n 103104-01)
A header sensor must be installed and wired
to the Master Sequencer “enabled” Sage2.1
Controller. The header sensor is installed on the
common system piping and provides blended
temperature information to the Sequence Master.
Refer to piping diagram Figures 40A and 41A
for installation location and Figure 48 or 49 for
installation detail.
b.
RJ45 Splitters (P/N 103192-01)
RJ45 Splitters are required for installing
communications between three or more boilers.
When two boilers are connected the splitter is not
required.
c. Ethernet Cables
Ethernet cables are used to connect the boiler
network together. These are standard “straight
through” cables that can be purchased at
electrical distributors.
Alternately, the network can be wired together
by simply wiring terminal J3, Modbus 2,
terminals A, B and V- between each boiler.
Refer to Figures 43 and 44 terminal J3 for wiring
location.
Figure 48: recommended “immersion”
Type Header Sensor installation Detail
Figure 49: alternate “Strap-On” Type Header
Sensor installation Detail
Note:
The “Strap-On” type sensor must be mounted to
the top side of a horizontal section of pipe as indicated in
Figures 40A and 41A.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...