58
103448-02 - 6/13
Figure 38:
n
ear Boiler Piping - Heating Plus
indirect W
ater Heater
Vi
. W
ater Piping and T
rim
C. Standard Installation Requirements (continued)
C
a
UT
iO
n
it is the installers responsibility
to select pumps
and
boiler
pip
ing
configurations
that
provide
the
proper
flow
rates
and
performance
for
the
boiler
and indirect water heater
.
r
efer to T
able 17 for recommended Boiler Loop
Circulator
.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...