103448-02 - 6/13
15
Figure 2C: Wall Mounting Hole Location / Layout
TOP EDGE OF BOILER
'HOLE C'
'HOLE A'
'HOLE D'
LE
FT
S
ID
E
O
F
B
O
IL
E
R
1.0" MIN. CLEARANCE TO COMBUSTIBLE
10.0" MIN. CLEARANCE TO COMBUSTIBLES
16
25
3
4
WALL MOUNTING BRACKET
CENTER LINE
BOTTOM SECURING
BRACKET CENTER LINE
2.0" MIN. CLEARANCE TO COMBUSTIBLE
'HOLE B'
3
16
" DIA. PILOT HOLES
FOR
5
16
" LAG SCREWS
(4 PLACES)
m. See Section IV Venting; Paragraph B, 5 “Field
Installation of CPVC Vent Pipe - Wall Mounted
Boiler Builds” for instructions on attaching the
vent system to the boiler.
Warning
Vent pipe must be inserted firmly into vent
connector and secured by tightening the metal
strap worm screw.
iii. Pre-installation and Boiler Mounting
G. General (continued)
n. After the boiler has been piped, wired, connected
to vent and combustion air system piping and
combustion performance testing completed per
Section IX “System Start-up”, install Access
Panel/Gasket assembly and secure with provided
four #8 x ½” black oxide Phillips head sheet
metal screws. See Figure 2E “access Panel and
Gasket Installation”.
Warning
access Panel must be installed while boiler is in
operation.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...