132
103448-02 - 6/13
appendix a - Figures (continued)
Figure
number
Page
number Description
Section iV - Venting (continued)
Figure 30
45
Cutting Vertical Terminal
Figure 31
45
Completing Vertical Terminal Installation
Figure 32
46
Chimney Chase Installation
Figure 33
47
Multiple Boiler Direct Vent Termination
Figure 34
49
Multiple Boiler Concentric Vent Termination
Section V - Condensate Disposal
Figure 35
51
Condensate Trap and Drain Line
Section Vi - Water Piping and Trim
Figure 36
52
Factory Supplied Piping & Trim Installation
Figure 37
57
Near Boiler Piping - Heating Only (with Central Heating Circulators)
Figure 38
58
Near Boiler Piping - Heating Plus Indirect Water Heater
Figure 39
60
Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger
Figure 40A
61
Multiple Boiler Water Piping w/Domestic Hot Water Heater (Page 1 of 2)
Figure 40B
62
Multiple Boiler Water Piping w/Domestic Hot Water Heater (Page 2 of 2)
Figure 41A
63
Alternate Multiple Boiler Water Piping w/ Indirect Domestic Hot Water Heater (Page 1 of 2)
Figure 41B
64
Alternate Multiple Boiler Water Piping w/Indirect Domestic Hot Water Heater (Page 2 of 2)
Section Vii - gas Piping
Figure 42
69
Recommended Gas Piping
Section Viii - Electrical
Figure 43
72 & 73
Wiring Connections Diagram
Figure 44
75
Ladder Diagram
Figure 45A
76
Modified Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -
Heating (with Central Heating Circulators) Plus Alternately Piped Indirect Water Heater
Figure 45B
77
Modified Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -
Heating (with Central Heating Zone Valves) Plus Alternately Piped Indirect Water Heater
Figure 46
78
Three Boiler Modular Wiring Diagram, Internal Sage2.1 Multiple Boiler Control Sequencer (Three
Boilers Shown, Typical Connections for up to Eight Boilers)
Figure 47A
79
Multiple Boiler Wiring Diagram w/Tekmar 265 Control
Figure 47B
80
Multiple Boiler Wiring Diagram w/Tekmar 264 Control
Figure 48
81
Recommended “Immersion” Type Header Sensor Installation Detail
Figure 49
81
Alternate “Strap-on” type Header Sensor Installation Detail
Figure 50
81
RJ45 Splitter Installation Detail
Section iX - System Start-Up
Figure 51
84
Lighting Instructions
Figure 52
85
Burner Flame
Figure 53
88
Dungs Gas Valve Detail
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...