80
103448-02 - 6/13
Viii
. Electrical
(continued)
Figure 47B: Multiple Boiler W
iring Diagram w/T
ekmar 264 Control
Tekmar 264 Based Control System (or equal)
Sequence of Operation
The
Tekmar 264 Control (or equal) can control up to four (4) boilers and an Indirect W
ater Heater by utilizing stage firing. When a call for heat is received by the
Tekmar 264
Control, the control will fire either one or more boilers in sequential firing mode to establish a required reset water temperature in the system supply main based on outdoor temperature.
The boilers will modulate on their own based on each boiler
’s Sage2.1™ Control and will target a setpoint temperature to supply enough input to the system
main to satisfy the desired reset water temperature in the main established by the
Tekmar 264 Control. When a call for Indirect Hot W
ater is generated to the
Tekmar 264,
the control will de-energize the zone pump control (ZC terminal), energize the Indirect pump and sequentially fire the boilers to establish a setpoint temperature in the main for the Indirect Heater using Priority
.
The
Tekmar 264 Control will disable the stage firing and post purge the Indirect Pump to reduce the temperature in the Supply Main
near the end of the Indirect Mode to a point where it will need to be when it changes back to Space Heating Mode.
The
Tekmar 264 Control also has the ability to rotate the
lead-lag firing of the boilers to establish equal operating time for each boiler stage.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...