iV. Venting
G. Multiple Boiler Installation Venting (continued)
h. When individual modules (boilers) are installed
in the same horizontal plane, chimney chase
vertical concentric venting is permitted provided:
V. Condensate Disposal
A.
Condensate Trap and Drain Line
.
1. All condensate, which forms in the boiler or vent
system, collects in the sump under heat exchanger
and leaves the boiler through factory installed
condensate trap.
2. The trap allows condensate to drain from sump
while retaining flue gases in the boiler. The trap
has factory installed overflow switch, which shuts
down the boiler in the event the drain line becomes
obstructed, preventing proper condensate removal.
Refer to Section XI “Service and Maintenance” for
condensate trap and condensate overflow switch
removal and replacement procedure, if required.
3. Note the following when disposing of the
condensate:
a. Condensate is slightly acidic, typical pH around
3.5 - 4.5. Do not use metallic pipe or fittings in
the condensate drain line. Do not route the drain
line through areas that could be damaged by
leaking condensate.
b. Do not route or terminate the condensate drain
line in areas subject to freezing temperatures.
c. If the point of condensate disposal is above the
trap, a condensate pump is required to move
the condensate to the drain. Select a condensate
pump approved for use with condensing boilers.
If overflow from the pump would result in
property damage, select a pump with an overflow
switch. Wire this switch in series with installer
provided external high limit, to shut off the
boiler, and, if desired, in series with installer-
supplied alarm, to trigger an alarm in the event
of overflow.
d. Do not attempt to substitute another trap for one
provided with the boiler.
i.
Sufficient inside space available at the base
of the chimney to install multiple chimney
chase brackets and support elbows.
ii.
Spacing between adjacent vertical vent
terminals is in accordance with Item ‘g’
above.
e. In order for boiler to work properly, the boiler
must be leveled during installation.
4. The condensate trap stub is located at boiler left
side, below inlet and outlet water pipe connections.
Refer to Figures 1A thru 1C.
5.
Condensate trap must be filled up with water,
prior to boiler start-up and before connecting
any condensate line to the boiler, to insure
combustion products cannot escape from
operating boiler.
To fill the trap, inject water in the
amount of 1 cup (8 fluid ounces) through condensate
trap stub opening. Do not overfill the trap.
6. If any additional condensate drain line is needed,
construct the extension from PVC or CPVC
Schedule 40 pipe. The factory supplied ¾” x 5-5/8”
long PVC coupling, located in the Part Carton, must
be used to connect drain line to the condensate trap
stub. Do not over tighten coupling compression nuts
when connecting drain line and condensate trap
stub.
Warning
Failure to install the condensate trap and
condensate drain in accordance with the above
instructions could cause flue gas to enter the
building, resulting in personal injury or death.
CaUTiOn
Boiler condensate is corrosive. route
condensate drain line in a manner such
that any condensate leakage will not cause
property damage.
Some jurisdictions may require that
condensate be neutralized prior to disposal.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...