iV. Venting
E. Concentric Polypropylene Venting (continued)
Figure 20: Fixed Extension (non-Cuttable)
Figure 19: Cut-To-Length Extension (Cuttable)
Figure 21: Cutting Straight Pipe
iii.
The male end of cuttable fittings must be held
to the collar with three (3) #10 x 1/2” sheet
metal screws. Drill a 1/8 hole through both
outer pipes to start this screw.
Use a drill stop
or other means to ensure that the drill bit
does not penetrate more than 3/8” into the
outer pipe. Do not use a sheet metal screw
longer than 1/2”
(see Figure 23).
Figure 22: Joining Cuttable Pipe
Figure 23: Joining Non-Cuttable Pipe
iv.
Use locking bands (provided with all fittings)
to secure non-cuttable pipe, as well as fittings,
to the boiler collar (see Figure 23).
v.
Use the same method to join all remaining vent
components except for the terminal.
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...