103448-02 - 6/13
23
Table 5a: CPVC/PVC Vent & air intake Components included With Boiler
Vent & air intake Components
Part
number
Quantity
aLP080B & aLP105B
Standard Termination
Vent Kit
(P/n 102189-01)
includes
aLP150B & aLP210B
Standard Termination
Vent Kit
(P/n 102189-02)
includes
aLP285B thru
aLP399 Standard
Termination Vent Kit
(P/n 102189-03)
includes
3” Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
102190-01
2
1
N/A
4” Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
102190-02
N/A
1
2
3” Stainless Steel Rodent Screen
102191-01
2
1
N/A
4” Stainless Steel Rodent Screen
102191-02
N/A
1
2
3” x 30” Schedule 40 CPVC Pipe
102193-01
1
1
N/A
4” x 30” Schedule 40 CPVC Pipe
102193-02
N/A
N/A
1
3” Schedule 80 CPVC 90° Elbow
102192-01
1
1
1
4” Schedule 80 CPVC 90° Elbow
102192-02
N/A
N/A
1
4 oz. Bottle of Transition Cement
102195-01
1
1
1
4 oz. Bottle of Primer
102194-01
1
1
1
3" Vent/3" Combustion Air CPVC/PVC
Connector
102183-01
1
N/A
N/A
3" Vent/4" Combustion Air CPVC/PVC
Connector
102183-02
N/A
1
N/A
4" Vent/4" Combustion Air CPVC/PVC
Connector
102183-03
N/A
N/A
1
3" Vent/3" Combustion Air CPVC/PVC
Connector Gasket
102185-01
1
N/A
N/A
4" Vent/4" Combustion Air CPVC/PVC
Connector Gasket
102185-02
N/A
1
1
d. Follow all manufacturer instructions and
warnings when preparing pipe ends for joining
and using the primer and the cement.
3.
Field Installation of CPVC/PVC Two-Pipe
Vent System Connector - Floor Mounted
Boiler Builds
Refer to Figure 6 and Steps below:
a. Position the CPVC/PVC vent connector and
gasket onto boiler rear/bottom panel and insert
vent connector inner stainless steel vent pipe into
heat exchanger vent outlet.
iV. Venting
B. CPVC/PVC Venting (continued)
b. Align vent connector plate and gasket clearance
holes with rear/bottom panel engagement holes;
than, secure the connector and gasket to the
panel with six mounting screws.
c. Apply supplied dielectric grease (grease pouch
attached to two-pipe vent connector) to gasket
inside vent section of two-pipe vent connector,
The grease will prevent gasket rupture when
inserting vent pipe and gasket deterioration due
to condensate exposure.
Vent Components
Part
number
Quantity
aLP080B &
aLP105B
Horizontal (Snorkel)
Termination
aLP150B &
aLP210B
Horizontal (Snorkel)
Termination
aLP285B thru
aLP399
Horizontal (Snorkel)
Termination
3" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
N/A
Supplied
by
Others
2
1
N/A
4" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
N/A
1
2
3" Schedule 40 PVC 90° Elbow
4
2
N/A
4" Schedule 40 PVC 90° Elbow
N/A
2
4
3" Schedule 40 PVC Pipe x ½ ft. min. horizontal run
2
1
N/A
4" Schedule 40 PVC Pipe x ½ ft. min. horizontal run
N/A
1
2
Table 5B: CPVC/PVC Vent & Air Intake Components (Installer Provided) required for Optional Horizontal
(Snorkel) Termination
Содержание ALP080B
Страница 72: ...72 103448 02 6 13 VIII Electrical continued ...
Страница 73: ...103448 02 6 13 73 VIII Electrical continued Figure 43 Wiring Connections Diagram ...
Страница 75: ...103448 02 6 13 75 VIII Electrical continued Figure 44 Ladder Diagram ...
Страница 136: ...136 103448 02 6 13 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...