EngyVolt RV15
Appendix
59
Name
Description
Unit
ADF point
KVASUM_MAX_
DMD
Maximum total system VA demand
kVA
51
A1_DMD
Phase 1 current demand
A
52
A1_MAX_DMD
Maximum phase 1 current demand
A
53
A2_DMD
Phase 2 current demand
A
54
A2_MAX_DMD
Maximum phase 2 current demand
A
55
A3_DMD
Phase 3 current demand
A
56
A3_MAX_DMD
Maximum phase 1 current demand
A
57
AN_DMD
Neutral current demand
A
58
AN_MAX_DMD
Maximum neutral current demand
A
59
V1_THD
Line 1 to neutral volts THD
%
60
V2_THD
Line 2 to neutral volts THD
%
61
V3_THD
Line 3 to neutral volts THD
%
62
VLNAVG_THD
Line to neutral volts THD average
%
63
V12_THD
Line 1 to line 2 volts THD
%
64
V23_THD
Line 2 to line 3 volts THD
%
65
V31_THD
Line 3 to line 1 volts THD
%
66
VLLAVG_THD
Line to line volts THD average
%
67
A1_THD
Phase 1 Current THD
%
68
A2_THD
Phase 2 Current THD
%
69
A3_THD
Phase 3 Current THD
%
70
AAVG_THD
Phase Current THD average
%
71
RESET
Reset
-
72
* The values represented refer to the prefix "k" for energy values. For prefix "M" they are larger by factor 1000.
In order to generate a reset, write the following values to the register "RESET".
Reset
Write
All energy values (electrical energy values)
1011
All demand average / maximum values
1012
Demand time base
1013
ADF points are one-based in the JCI compliance test software but zero-based on the network.
Содержание EngyVolt RV15
Страница 2: ......
Страница 6: ...Safety instructions EngyVolt RV15 6 Reference to a page in this manual Reference to a graphic ...
Страница 62: ......
Страница 63: ......
Страница 64: ...www endress com worldwide BA01040K 09 EN 01 11 71155512 EH COSIMA ...