Dosimass
Installation
Hauser
11
3.3
Post-installation check
Perform the following checks after installing the measuring device in the pipe:
Device condition and specifications
Notes
Is the device damaged (visual inspection)?
–
Does the device correspond to specifications at the measuring point, including process temperature
and pressure, ambient temperature, measuring range, etc.?
33 ff.
Installation instructions
Notes
Does the arrow on the sensor nameplate match the direction of flow through the pipe?
–
Are the measuring point number and labeling correct (visual inspection)?
–
Is the orientation chosen for the sensor correct, in other words suitable for sensor type, fluid
properties (outgassing, with entrained solids) and fluid temperature?
7 ff.
Process environment / process conditions
Notes
Is the measuring device protected against moisture and direct sunlight?
–
Содержание dosimass
Страница 2: ......
Страница 58: ...www endress com worldwide BA00097D 06 EN 14 12 71195407 FM SGML 10 0 ProMoDo...