Deltabar PMD75B HART
Installation
Hauser
15
3
3
A / D
K
1
1
2
2
3
N
1
3
3
N
2
1
3
1
1
G / J
3
A0038688
1
A/D, G/J, K, N: order options
A/D Horizontal impulse line, left or right side HP, with side vent. Thread on one side and side thread for horizontal
impulse line.
G/J Vertical impulse line, left or right side HP, with vent. Thread on each side for vertical impulse line.
K
Universal side flange, with vent. Thread on each side and side thread for universal mounting.
N
Gauge pressure/absolute pressure: Bottom process connection, left side HP, vent on one side. Thread on each
side and side thread for mounting on existing manifolds.
N
Differential pressure: Bottom process connection, left side HP, vent on both sides. Thread on each side and
side thread for mounting on existing manifolds.
1
Vent valve
2
Sealing plug
3
Impulse line
5.2
Mounting the measuring device
5.2.1
Flow measurement
Flow measurement in gases
+
–
4
3
2
1
A0038211
1
Orifice plate or pitot tube
2
Shut-off valves
3
Three-valve manifold
4
Measuring device
Mount the measuring device above the measuring point so that condensate can flow into
the process piping.