Pre-Installation Guidelines
9
3.4
Connections and System Setup
• Plan the routing of wiring, piping and ductwork to the unit. See
Figure 61
and
Figures 76
through
96
for unit connection locations.
• Water/glycol and GLYCOOL units utilizing a drycooler may require an optional aquastat setting.
See
Tables 66
through
69
for aquastat setting guidelines. Applications with the optional stat
setting require field piping to be insulated to prevent condensation.
• The unit requires a drain, which must comply with all applicable codes. This drain line may
contain boiling water. See
9.1.1 - Condensate Piping—Field-Installed
for details.
• Three-phase electrical service is required for all models. Electrical service must conform to
national and local electrical codes. See equipment nameplate for details.
• If seismic requirements apply, consult your local Emerson representative for information about a
seismic-rated floor stand.
3.5
Operating Conditions
• The Liebert DS must be operated in a conditioned space within the operating envelope ASHRAE
recommends for data centers: Maximum temperature of 77°F (25°C) DB and 55% RH or
maximum WB of 65.5°F (18.6°C).
Operating outside this envelope can decrease equipment reliability.
• Return air to the unit must be no cooler than the ASHRAE recommendation of 68°F (20°C) DB
and 40% RH or minimum WB of 54°F (12.2°C) for proper unit operation.
Operating below this can decrease equipment reliability.
Refer to ASHRAE’s publication, “Thermal Guidelines for Data Processing Environments.”
NOTE
Seal openings around piping and electrical connection to prevent air leakage. Failure to do so
could reduce the unit’s cooling performance.
Содержание Liebert DS Series
Страница 1: ......
Страница 2: ......
Страница 164: ...HVAC Maintenance Checklist 154 NOTES ...
Страница 165: ...HVAC Maintenance Checklist 155 ...
Страница 166: ...HVAC Maintenance Checklist 156 ...