Piping Schematics
117
Figure 90 Primary connection locations—upflow, air-Cooled, 28-42kW (8-12 ton), semi-hermetic
compressor models
Point
Description
X
in. (mm)
Y
in. (mm)
Connection Size / Opening
in. (mm)
R1
Refrigerant Access (Top)
60-1/2 (1537)
1-7/8" (48mm)
10-1/8 x 4-1/8 (257 x 105)
R2
Refrigerant Access (Bottom)
59-3/8" (1508mm)
14-3/4" (375mm)
11-1/8 x 4 (283 x 102)
L1
Liquid Line System 1
70" (1778mm)
16-3/4 (425)
1/2" Cu Sweat
L2
Liquid Line System 2
67-5/8" (1718mm)
16-3/4 (425)
1/2" Cu Sweat
G1
Hot Gas Discharge 1
65-3/8" (1661mm)
16-5/8 (422)
5/8" Cu Sweat
G2
Hot Gas Discharge 2
63" (1600mm)
16-5/8 (422)
5/8" Cu Sweat
R3
Refrigerant Access (Side)
—
—
6 x 17-3/16 (152 x 437)
CGD*
Condensate Gravity Drain
—
—
3/4" FPT
CPD
Condensate Pump Discharge (Opt)
56-1/4 (1429)
11-1/8 (283)
1/2" Cu Sweat
HUM
Humidifier Supply Line
56-1/4 (1429)
9-1/8 (233)
1/4" Cu Sweat
ECS**
Econ-O-Coil Supply
56 (1423)
7-5/16 (186)
1-5/8" Cu Sweat
ECR**
Econ-O-Coil Return
56 (1423)
4-1/2 (114)
1-5/8" Cu Sweat
E1
Electrical Conn. (High Volt)
52-3/8 (1330)
30 (762)
2-1/2"
E2
Electrical Conn. (High Volt)
46-7/8 (1191)
30 (762)
2-1/2"
LV1
Electrical Conn. (Low Volt)
19-1/2 (495)
29-1/16 (738)
7/8"
LV2
Electrical Conn. (Low Volt)
19-1/2 (495)
30-1/2 (775)
7/8"
LV3
Electrical Conn. (Low Volt)
19-1/2 (495)
31-15/16 (811)
7/8"
*
Field pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do
not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply
with all local codes.
** Supplied on Dual Cooling Systems only
DPN001119
Rev. 2
O
X
Y
E1
E2
LV 1
LV 2
LV 3
BLOWER
OUTLET
L1 L2 G1 G2
R2
L1L2G1 G2
R1
Front of Unit
3.
3.
3.
4.
NOTES:
1. Drawing not to scale.
2. Tolerance on all piping dimensions
is ± 1/2" (13mm).
Field routed alternatives for refrigerant
gas and liquid line connection points.
See submittal page DPN001120 for
blower outlet and deck dimensional data.
All dimensions from
rear corner of unit
including panels
73" (1854mm)
LEFT SIDE SECTION
35"
(889mm)
Factory Location
FRONT SECTION
TOP VIEW
CGD*
CGD*
R3
6"
(152mm)
17-3/16"
(437mm)
3-7/8"
(98mm)
14-1/4"
(362mm)
15-7/8"
(403mm)
4
3
4-1/8" (105mm)
10-1/8"
(257mm)
HUM
CPD
ECR
ECS
11-1/8"
(283mm)
4" (102mm)
17-1/16"
(434mm)
(Left Front Panel Not Shown)
3
3
3
Содержание Liebert DS Series
Страница 1: ......
Страница 2: ......
Страница 164: ...HVAC Maintenance Checklist 154 NOTES ...
Страница 165: ...HVAC Maintenance Checklist 155 ...
Страница 166: ...HVAC Maintenance Checklist 156 ...