27
Service Instructions
MAN-02-08-77-0714-EN Rev. 2
September 2020
Section 4: Set-up/Start-up Procedure
Set-up/Start-up Procedure
Figure 15
2-Way Remote Electric With an ESD Solenoid Function Schematic
(L)
Hand Pump Selector
(M)
Hand Pump Selection Valves
(H)
Accumulator Isolation Valve(Optional)
(N)
Accumulator Isolation Valve(Optional)
(J)
Opening Solenoid
(K)
Closing Solenoid
(O)
Hand Pump Isolation Valve
(P)
ESD Solenoid Valve(Optional)
M
M
L
H
N
J
Y
K
O
P
4.4.3
Manual Open or Close with Accumulator Override feature (Optional)
NOTE:
The components referenced below are referencing Schematic 4.4.2. and is for illustration
purposes only. When using this procedure refer to the Bettis EHO Actuator General
Arrangement Drawing and Hydraulic Schematic for the unit being worked on.